YOUR PROJECT IN GENEVA
Nursery and children’s space fit-out work in Geneva
Welcoming families, organising activities and preparing rest times requires spaces with clearly defined uses. MS Contractor SA studies nursery renovation and fit-out work in Geneva with those responsible for the project, based on the premises and the planned childcare organisation.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Partitions, floors, ceilings, washrooms and storage are prepared around the movements of the children and staff. Present the groups cared for, the uses of each room and the equipment kept. This information is used to choose the fittings and finishes, taking daily cleaning into account.
Send the available plans and the needs expressed by the managers of the facility. If part of the premises must remain in use, state the spaces concerned. The quote request can then specify the work, the supplies and the constraints to examine with the people involved in the project.
Linking reception, activity and rest areas
A works project in a nursery is prepared with the management and the requirements linked to caring for children. MS Contractor SA studies the building work based on the spaces concerned and the brief provided.
- Present the uses of the rooms concerned and what you would like to improve. Specify the needs for storage, maintenance and circulation.
- Provide any requirements already set for materials, washrooms and equipment. Their suitability depends on the project and the applicable requirements.
- State the periods when the premises can be vacated. Any separation between activity and work must be studied before phasing is chosen.
The visit makes it possible to examine the substrates and access constraints. The compliance of the childcare facility and any permits remain to be checked with the competent bodies.
Present my projectOur nursery projects in Geneva






What the project includes
- Partitions and room organisation
- Floors and ceilings
- Washrooms and water points
- Storage and finishes
Preparing your project
- 1
Organising the rooms and transitions
Describe the course of a day and the movements between activities. The cloakroom, storage and passages are positioned according to actual use. Elements at child height and equipment used by staff must be specified on the plan before finishes are chosen.
- 2
Taking noise and maintenance into account
State the rooms where noise disturbs activities or rest. The project must examine the surfaces and separations before a treatment is chosen. Coverings are also chosen according to cleaning practices and floor use. The junctions and maintenance of the chosen system must be discussed.
- 3
Preparing washrooms and storage
Present the fixtures, water points and changing areas concerned. Dimensions and connections are looked at together with the layout of the room. For storage, specify what must be accessible and what must remain reserved for staff. Its positioning is prepared with the available supports.
- 4
Defining the site conditions
State the childcare periods and the spaces that could be vacated. The organisation must examine the separation of the site, its access and the planned work. Documents and requirements specific to your project must be provided during preparation. The form lets you bring this information together for a first study of the work.
Frequently asked questions
Yes. A change of use of premises and a change to their layout require a building permit (LCI, Article 1). In a building constructed before 1991, the owner also has the parts affected by the work checked for amiante and PCBs.
Specify its uses, the equipment kept and the points you would like to improve. Attach the dimensions and photos, as well as the documents available for the project.
State the rooms concerned and the times when noise interferes with their use. A plan helps locate the partitions and openings to examine in the study.
Present these items in the same request, specifying the fixtures and the expected uses. Their dimensions and connections must be examined together with the layout of the spaces.
That depends on the work, the spaces available and the conditions for separating the site. It must be studied with the managers before a schedule is chosen.
Present the rooms concerned, the washrooms, the storage and the points to improve. Separate the work on floors, partitions and installations from purchases of furniture or educational equipment. Specialist work and requirements to be examined with the managers must be identified separately. MS Contractor SA can study the work with your priorities and the available periods before refining the quote.
Nurseries, the municipalities where we work
We carry out this type of project throughout the canton of Geneva.
All the areas we coverA nursery fit-out project?
Present your nursery and the work you want. Attach the available plans and a few photos to prepare a quote tailored to your project.
The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
