MS Contractor SA

Frequently asked questions about your renovation work in Geneva

MS Contractor SA is a general building contractor (BTP) in Geneva, listed in the commercial register under number CHE-218.172.825. Once the permit is granted, a single contact coordinates all the trades, from demolition to finishes, in all 45 municipalities of the canton.

Here you will find the answers published on our pages, sorted by topic, with a link to the full page. For a question about your project, call +41 79 557 14 50, write to mscontact@bluewin.ch or use the quote request. Our address is Rue de la Servette 88, 1202 Geneva.

Your request and your quote

Which renovation projects can I present to MS Contractor SA?

You can present work in a house, a villa, an apartment or business premises. State the rooms or areas concerned and the changes you would like so the study can be prepared.

Can one request cover several building trades?

Yes. Present the project as a whole rather than separating each job. The installations, substrates and finishes can then be studied together with their junctions.

What information should I include to prepare a quote in Geneva?

State the type of property, its municipality and the work expected. Add photos, any available plans, the preferred period and any known occupancy constraints.

Which renovation company should I choose in Geneva?

A company that coordinates all the trades, with a single contact from the moment the permit is granted to the handover, spares you from coordinating the mason, partner electrician, plasterer and painter yourself. That is how MS Contractor SA works in Geneva, for houses, apartments, villas and business premises, with a detailed itemised quote before any commitment.

What is a general building contractor?

A general contractor takes on all the work on a project on behalf of the client, who signs a single contract and, once the permit is granted, deals with a single contact. It schedules the trades, orders the materials and checks the work through to handover. MS Contractor SA works this way in Geneva, in renovation as well as construction.

What does the quote for a renovation in Geneva include?

The quote depends on the floor area, the condition of the home, the items selected and the finishes chosen. The MS Contractor SA quote details each item, so the project can be adjusted before work starts, for example by keeping a kitchen or a floor in good condition. The quote request comes with no obligation.

How long does renovation work take?

A bathroom is usually redone in a few weeks, while a complete apartment or house renovation takes several months depending on the floor area, material orders and the sequence of the trades. The schedule is set with you in the quote and takes into account whether you live in the home during the work.

Do I need an architect or a building permit to renovate in Geneva?

Interior demolition may require a permit, even without work on a load-bearing wall. The procedures depend on the building, the elements removed and the planned changes. Before starting, have your project checked by your architect, your MPQ (qualified professional representative) or the Department of the Territory. MS Contractor SA organises and carries out the planned work in coordination with your representative. The procedures are explained on the State of Geneva website, on the page about applying for a building permit.

Request a quote

Complete house renovation in Geneva

Is a permit needed to renovate a house in Geneva?

Work inside a villa is exempt from a building permit when it does not change the habitable floor area, subject to heritage protection rules (LCI, Article 1). An extension, a change to the façades or a change in volume requires a permit. In zone 5 and with no derogation requested, the file follows the accelerated procedure.

What should be checked before renovating a house built before 1991?

The owner has the parts affected by the work checked for amiante and PCBs. This check is mandatory in Geneva, whether or not the work requires a permit. It is carried out before dismantling begins.

Can MS Contractor SA work on just part of my house in Geneva?

You can present a targeted project as well as a larger renovation. The useful work and how it connects with the parts you keep need to be examined to define a consistent scope.

How do I present work that I would like to spread over several stages?

State your priorities and the elements that can wait. The study must distinguish the jobs that depend on one another from the work that can be organised separately.

Which photos should I send if I notice deterioration in the house?

Attach a general view of the room or area and a close-up of the point to be repaired. Say how long it has been visible and any work already carried out, if you know it.

Is a floor area in square metres enough to study the renovation of a house in Geneva?

A floor area in square metres does not on its own describe the work on your house. Repainting rooms and redoing a roof, installations or bathrooms are not the same work. Send MS Contractor SA the floor area, the known condition of the building and your priorities. The quote can then separate the essential work, the finishes chosen and the options to consider before you decide.

See the complete house renovation page in Geneva

Villa renovation in Geneva

Can the interior of a villa be renovated without a permit in Geneva?

Yes, when the work stays inside and does not change the habitable floor area, subject to heritage protection rules (LCI, Article 1). As soon as the project affects the volume, the façades, a fence or a gate, a building permit is required.

What is the response time for a permit in the villa zone?

In zone 5, a project with no derogation requested follows the accelerated procedure, with a legal response time of 30 days from the registration of the file (LCI, Articles 3 and 4). The permit remains valid for 2 years to start the work.

Does a villa renovation always include work in the garden?

No. The scope depends on your request and the junctions required. An interior project can remain targeted, while a larger transformation may also involve the surroundings.

How do I present an idea for a villa extension in Geneva?

Explain how the extra space will be used and attach any available plans. The idea then needs to be examined with the existing structure, the plot and the applicable procedures.

Why show the access before outdoor work?

The width of the passageways, steps and elements to be preserved affect deliveries and organisation. Photos help identify these constraints before the checks on site.

How do I compare several villa renovation quotes in Geneva?

Check that the offers cover the same spaces and the same services. In a villa, the roof, façades, installations and surroundings can be separate items from the interior work. Ask for the elements kept, the supplies and the junctions included to be specified. Present your scope and your choices to MS Contractor SA to prepare an offer that lets you compare solutions on a common basis.

See the villa renovation page in Geneva

Complete apartment renovation in Geneva

Is a permit needed to renovate an apartment in Geneva?

In an apartment building, the LDTR requires a building permit for work that goes beyond simple maintenance. This law applies in the first four building zones. Most apartment renovations follow the accelerated procedure, known as APA, with a legal response time of 30 days from the registration of the file.

What should be checked before renovating an apartment built before 1991?

The owner has the parts affected by the work checked for amiante and PCBs before the work begins. This check is mandatory in the canton of Geneva, even for work that needs no permit. For paint applied before 2006, the absence of lead is also checked.

Who has to be informed before work starts in an apartment?

The holder of a permit issued under the accelerated procedure informs the tenants in writing, and the co-owners where applicable, before the site opens (LCI, Article 3). A site opening notice is also filed 30 days before work starts with the building permit office (Office des autorisations de construire).

How do I prepare an apartment renovation request in Geneva?

Present the rooms, what no longer suits you and the changes you would like. Add plans, photos and any known information about the building. Also state the elements to keep.

What checks should be planned before moving the bathroom?

The drains, supply pipes and layout of the home must be examined. Shared installations and any procedures also affect the options before a new layout is chosen.

How do I compare a targeted renovation with a complete renovation?

Compare the needs met and the work included, with the junctions to the parts you keep. The options should specify the installations, finishes and occupancy constraints rather than being limited to the number of rooms.

What does the quote for an apartment renovation in Geneva depend on?

The quote depends as much on the rooms to transform as on the total floor area. The kitchen, bathroom, installations, substrates and finishes must be detailed. The floor level, access and protection of the common areas can also affect the organisation. Send MS Contractor SA photos, the approximate floor areas and the equipment to keep to request a quote tailored to your apartment.

See the complete apartment renovation page in Geneva

Shop fit-out in Geneva

Is a permit needed to convert a shop in Geneva?

A project that changes the layout of the premises, the architecture or the use of a shop requires a building permit (LCI, Article 1). Interior alterations follow the accelerated procedure, known as APA, with a legal response time of 30 days. Work on a shopfront also requires a permit.

Does a shopfront have to be insulated?

Yes. Shopfronts that open onto a heated space are subject to the same upgrading obligation as single-glazed windows. The deadline set by the canton for bringing them into compliance was 31 December 2025. Replacing a shopfront requires a building permit application.

What should I provide for a shop fit-out quote in Geneva?

Attach the plans and photos, then describe your business, the equipment and the elements you are keeping. State whether the project concerns an opening, a complete renovation or part of the shop.

Can part of the current display units be kept?

Present the elements to keep and their dimensions. Their condition, position and how they connect with the new fittings must be examined before the project is defined.

Does the shop have to close for the fit-out to be redone?

That depends on the areas concerned, the access and the technical work. Options for working zone by zone and any closure periods are clarified during preparation.

Why include the stockroom in the sales floor project?

Deliveries and movements between stockroom and shop affect the layout. Their route helps position the fittings and plan the spaces the team needs.

What should be separated in the quote to renovate a shop in Geneva?

Distinguish the work on the premises from the sales fittings. Preparing floors and walls, installations and lighting are not priced like display units, the counter or the stockroom. State the furniture you are keeping and the equipment ordered separately. MS Contractor SA can then study your request together with the delivery constraints and the period planned for the work.

See the shop fit-out page in Geneva

Retail unit renovation in Geneva

Can the activity of a retail unit be changed without a permit?

No. A change of use of premises requires a building permit, in the same way as a change to their layout or architecture (LCI, Article 1). The file is submitted online on the State of Geneva’s AC-Démat platform.

Does work on a retail unit have to be announced before it starts?

Yes. Every site requires a site opening notice, filed 30 days before work starts with the building permit office (Office des autorisations de construire). If the site encroaches on the pavement, an additional notification is sent to the canton or the municipality, depending on the street concerned.

What should I provide to have a retail unit studied before I move in?

Present the planned business, the plans and the equipment envisaged. Add photos of the premises and the available documents on the installations and the building’s constraints.

Can installations from the previous occupant be kept?

Their condition and suitability for the new use must be examined. Specify the elements to keep so that repairs and replacements can be separated in the offer.

Should the shopfront be included in the interior project?

Present the changes you want together with the fit-out. Access and junctions can concern both parts, and the procedures specific to the project must be checked.

How do I prepare the work with my furniture suppliers?

Send the plans, the dimensions and the known delivery dates. State who supplies and installs each item of equipment to clarify the connections and the order of the work.

Why separate the work on the premises from the equipment in a retail unit quote?

A retail unit may need work on services, floors or partitions before the furniture specific to your business is installed. Separating these items shows what concerns the building and what depends on the equipment chosen. Attach the plans of the premises, the available information on the installations and the needs of the business so that MS Contractor SA can examine the services to plan and the interfaces with your suppliers.

See the retail unit renovation page in Geneva

Pharmacy fit-out in Geneva

Is a permit needed to refit a pharmacy in Geneva?

When the project changes the layout of the premises or the shopfront, a building permit is required (LCI, Article 1). Interior alterations to an existing building follow the accelerated procedure, with a legal response time of 30 days from the registration of the file. A site opening notice is filed 30 days before work starts.

Can the pharmacy be modernised without replacing all the fittings?

The project can cover certain items only. State the counters, storage and equipment to keep so the junctions can be examined and the work defined to suit your request.

What should I prepare to move a workstation in the pharmacy?

Present its preferred location and the equipment used. The dimensions, power supplies and links with the other spaces must be examined together.

How can deliveries be included in the preparation of the work?

State their route and the usual delivery times. This information is used to study access, storage of materials and the site constraints.

Which company should I consult for my pharmacy project in Geneva?

You can send your request to MS Contractor SA to study the building work and the fittings. Add the plan of the premises, the equipment concerned and the changes expected.

What should a pharmacy renovation quote in Geneva detail?

The quote should make it possible to identify the work on the premises, the fittings selected and the connections for the pharmacy’s equipment. Specify the counters and storage kept as well as the work planned with your suppliers. Periods of unavailability, deliveries and access to the stockroom are discussed along with the scope of the work. These elements help MS Contractor SA study a proposal consistent with how you operate.

See the pharmacy fit-out page in Geneva

Nursery fit-out in Geneva

Is a permit needed to convert premises into a nursery in Geneva?

Yes. A change of use of premises and a change to their layout require a building permit (LCI, Article 1). In a building constructed before 1991, the owner also has the parts affected by the work checked for amiante and PCBs.

What information should I send to renovate a nursery room?

Specify its uses, the equipment kept and the points you would like to improve. Attach the dimensions and photos, as well as the documents available for the project.

How do I describe noise between spaces?

State the rooms concerned and the times when noise interferes with their use. A plan helps locate the partitions and openings to examine in the study.

Can the washrooms be studied together with the fit-out of the rooms?

Present these items in the same request, specifying the fixtures and the expected uses. Their dimensions and connections must be examined together with the layout of the spaces.

Can work be planned while the nursery is open?

That depends on the work, the spaces available and the conditions for separating the site. It must be studied with the managers before a schedule is chosen.

How do I prepare the quote for nursery work in Geneva?

Present the rooms concerned, the washrooms, the storage and the points to improve. Separate the work on floors, partitions and installations from purchases of furniture or educational equipment. Specialist work and requirements to be examined with the managers must be identified separately. MS Contractor SA can study the work with your priorities and the available periods before refining the quote.

See the nursery fit-out page in Geneva

Office fit-out in Geneva

Is a permit needed to partition offices in Geneva?

When the partitions change the layout of the premises, the work requires a building permit (LCI, Article 1). These interior alterations follow the accelerated procedure, known as APA, with a legal response time of 30 days. The permit holder informs the tenants in writing before the site opens.

What should be checked before converting offices in an older building?

In a building constructed before 1991, the owner has the parts affected by the work checked for amiante and PCBs, for example false ceilings and old floor coverings. This check is mandatory in Geneva, even without a building permit.

Do you install office partitions and false ceilings in Geneva?

Yes. We install frameless glass partitions, movable partitions for meeting rooms, screens between workstations and acoustic false ceilings. Electrics and lighting, entrusted to our partner electrician, are coordinated with the finishes.

How do I prepare an office project without a final plan?

Describe the activities, workstations and shared spaces you want. An existing plan and photos help place these needs before the layout is defined.

Can the work be studied while the offices are occupied?

Present the areas available and the teams’ constraints. The organisation options depend on the work, access and any interruptions required.

Why send the furniture dimensions before the connections?

The workstations and equipment are the reference points for positioning power supplies and networks. Their dimensions also make it possible to examine the passages between spaces.

What should I specify to create a meeting room in the offices?

State its use, the capacity you want and the equipment planned. Light, technical connections and noise must be examined together with the layout.

Is the number of workstations enough to study an office renovation?

The number of workstations gives a reference point, but it does not describe the condition of the premises or the technical work. Partitions, ceilings, floors, lighting and connections depend on the layout and the shared spaces. Have the building work, furniture and IT separated when they come from different suppliers. Send your plan and the teams’ needs to prepare a quote with MS Contractor SA.

See the office fit-out page in Geneva

Restaurant fit-out in Geneva

Is a permit needed to convert premises into a restaurant in Geneva?

Yes. A change of use of premises and a change to their layout require a building permit (LCI, Article 1). Work that does not change the general appearance of the building follows the accelerated procedure, with a legal response time of 30 days.

Which company should I contact to fit out a restaurant or café in Geneva?

MS Contractor SA can study your project and coordinate the trades needed for the work. Send the plan of the premises, photos and the planned business to request a no-obligation quote.

What information should I provide before choosing the kitchen equipment?

Present the planned operation, the appliances envisaged and the known installations. Their water, electricity, drainage and ventilation needs must be compared with what the premises allow.

How do I prepare the conversion of premises into a restaurant?

Gather the plans and information on the current use of the premises. The technical options, the agreements and the necessary permits must be examined before the fit-out or orders are confirmed.

Can the restaurant stay open during the renovation?

That depends on the extent of the work and whether the areas can be separated. Access, installations and operating conditions must be examined before deciding how the restaurant will run during the work.

What should be included in the quote for a restaurant renovation in Geneva?

The dining room, the counter and the professional kitchen must be examined together with the existing installations. Water, electricity, drainage and ventilation needs vary with the equipment chosen. Separate its supply from the connection work and the finishes. Send the plan of the premises and the appliance data to MS Contractor SA to study the work before setting the period of work.

See the restaurant fit-out page in Geneva

Shelters, pool houses and small buildings in Geneva

Is a permit needed to build a garden shed in Geneva?

In a building zone, a movable shed of about 5 m² on the ground and 2 m high is exempt from a building permit, subject to heritage protection rules. A larger shed, or one fixed to the ground, requires a permit. These minor structures in principle follow the accelerated procedure, with a legal response time of 30 days.

How do I estimate the size of a storage shed?

Measure the equipment to be stored and plan its access. A sketch showing the doors and passageways helps discuss the useful dimensions.

All the questions on the shelters, pool houses and small buildings page

Access routes, paths and parking spaces in Geneva

Is a permit needed to create a parking space or an access in Geneva?

Yes. Laying out traffic routes, parking spaces or an exit onto the public highway requires a building permit (LCI, Article 1). So do changes to the configuration of the ground.

What has to be announced when the site affects the public highway?

A site opening notice is filed 30 days before work starts. If the site encroaches on the public highway, an additional notification is sent to the cantonal transport office or to the municipality, depending on the street concerned. On a cantonal road, permission to use the public domain is requested from the canton.

All the questions on the access routes, paths and parking spaces page

Building permits in Geneva

What work requires a building permit in Geneva?

Geneva’s building act (LCI, Article 1) requires a permit for any new structure, including a wall, a fence or a gate. It also covers work that changes the volume, architecture, colour, room layout or use of a building, as well as demolitions, changes to the configuration of the ground and the creation of parking spaces. No work starts before the permit is issued.

What work can be done without a building permit?

Work inside a villa is exempt when it does not change the habitable floor area, subject to heritage protection rules. In a building zone, the law also exempts very minor structures, for example a movable shed of about 5 m² on the ground and 2 m high, or an uncovered pergola. In an apartment building the rule is different, because the LDTR, Geneva’s law on residential buildings, applies.

All the questions on the building permits page

Drainage in Geneva

What information should I provide for drainage pipes that need work?

State the areas and equipment concerned. Describe the signs, how they have changed and previous work, with the available plans.

Does moving a bathroom require the drains to be reworked?

The new connections must be examined with the existing network. The route and the available levels may limit the layout.

All the questions on the drainage page

Tiling in Geneva

What should be checked before removing old tiles?

In a building constructed before 1991, the owner has the parts affected by the work checked for amiante, which includes old tiles and their adhesives. This check is mandatory in the canton of Geneva, even without a building permit. It is carried out before removal.

Which company should I contact to lay tiles in Geneva?

MS Contractor SA can study your surfaces and the covering you want. Photos and the available dimensions help prepare the quote request.

All the questions on the tiling page

Roof structure in Geneva

Does a warped timber member mean a new roof structure is needed?

Its condition, its supports and its role in the structure must be examined. A visible deformation is not enough to decide between repair, reinforcement and replacement.

Can I move an element to convert the loft?

This change requires a study of its role in the structure and the work needed. Present the conversion before any modification is decided.

All the questions on the roof structure page

Heating in Geneva with our partner companies

Is a permit needed to install a heat pump in Geneva?

Inside an existing building located in a building zone, installing a heat pump is exempt from a building permit. Outside, the exemption is subject to conditions, including an output that does not exceed 20 kW (LCI, Article 1). In all cases, the installation is declared to the cantonal energy authority before work starts.

Can a heating replacement be subsidised in Geneva?

The canton supports the replacement of fossil fuels in buildings. The subsidy application must reach the cantonal energy office (Office cantonal de l’énergie) at least 14 days before the work concerned starts. The installations supported and their conditions are set out in the scale published by the canton.

All the questions on the heating page

Fences and garden landscaping in Geneva

Is a permit needed to install a fence or a gate in Geneva?

Yes. Geneva law requires a permit to build a wall, a fence or a gate (LCI, Article 1). For these minor structures, the file in principle follows the accelerated procedure, with a legal response time of 30 days.

Is a permit needed for a pergola or a garden shed?

In a building zone, an uncovered pergola and a movable shed of about 5 m² on the ground and 2 m high are exempt from a permit, subject to heritage protection rules. Beyond these dimensions, a building permit is required.

All the questions on the fences and garden landscaping page

Made-to-measure kitchens in Geneva

Is a permit needed to redo a kitchen in Geneva?

In a villa, interior work that does not change the habitable floor area is exempt from a building permit. In an apartment building, the LDTR requires a permit for work that goes beyond simple maintenance, and the file most often follows the accelerated procedure. In an apartment building, a project that moves a partition or changes the room layout requires a permit.

What should be checked before removing an old kitchen?

In a building constructed before 1991, the owner has the parts affected by the work checked for amiante, for example old floor coverings and tile adhesives. This check is mandatory in the canton of Geneva, even without a building permit. It is carried out before removal.

All the questions on the made-to-measure kitchens page

Demolition and dismantling in Geneva

Is a permit needed to demolish in Geneva?

Yes. Demolishing a structure requires a permit (LCI, Article 1). A complete demolition is the subject of a separate application, whereas an interior or partial demolition can be included in the conversion application. Demolition work only starts once the permit has come into force.

What has to be done before demolishing in a building constructed before 1991?

The owner has the parts to be demolished checked for amiante and PCBs. This check is mandatory, whether or not the work requires a building permit. If amiante is present, it is as a general rule removed under containment by a specialist company, before the rest is dismantled.

All the questions on the demolition and dismantling page

Electrical work in Geneva with our partner companies

How do I prepare a quote for electrical work in Geneva?

State the rooms and appliances concerned, then the changes you want. Attach the available plans and the other work planned so the connections can be examined.

Does an extra socket mean all the circuits have to be redone?

The scope depends on the installation and its uses. An inspection makes it possible to distinguish a targeted adaptation from wider work.

All the questions on the electrical work page

Façades in Geneva

Is a permit needed to redo a façade in Geneva?

As soon as the work changes the architecture or the colour of the building, a building permit is required (LCI, Article 1). External insulation falls into this case. When the general appearance of the building is not changed, the file in principle follows the accelerated procedure, known as APA.

Are there subsidies for insulating a façade in Geneva?

The canton of Geneva subsidises work that improves the energy performance of buildings. The application must reach the cantonal energy office (Office cantonal de l’énergie) at least 14 days before the work concerned starts, and that work is to be carried out within 24 months of the decision. The measures supported and their conditions are set out in the subsidy scale published by the canton.

All the questions on the façades page

Windows and doors in Geneva

Is replacing single-glazed windows mandatory in Geneva?

Yes. Owners of heated buildings that still have single-glazed windows must bring them into compliance, or face administrative penalties. The deadline was set at 31 January 2016 for windows and 31 December 2025 for shopfronts. Derogations exist for glazing of heritage interest.

Is a permit needed to change windows in Geneva?

On a building that is not listed, work limited to the windows is treated as maintenance and does not require a building permit. A site opening notice still has to be filed 30 days before work starts. A permit is however required for shopfronts, listed buildings and work covered by the LDTR.

All the questions on the windows and doors page

Roof sheet metal work in Geneva

Does an overflowing gutter always have to be replaced?

The condition of the gutter and the drainage conditions must be examined. The overflow alone does not justify a replacement.

Why show the fixings of a downpipe?

They are part of the installation and its supports. Their condition helps define the parts to keep and the work required.

All the questions on the roof sheet metal work page

Sound insulation in Geneva

Does insulation against voices also deal with footstep noise?

The transmission mechanisms can differ. The project must distinguish the noises observed and examine the structures concerned before a treatment is chosen.

Why look at the ceiling for a noise heard near the wall?

Sound can travel through several elements of the building. Where it is heard is not enough to identify its path.

All the questions on the sound insulation page

Thermal insulation in Geneva

How do I apply for a subsidy to insulate a building in Geneva?

The application is submitted before the work. It must reach the cantonal energy office (Office cantonal de l’énergie) at least 14 days before the subsidised work starts, and that work is to be carried out within 24 months of the decision. The measures supported and their conditions are detailed in the canton’s subsidy scale.

Is a permit needed to insulate a house from the outside?

Yes. External insulation changes the architecture of the building and requires a building permit (LCI, Article 1). Inside a villa, work that does not change the habitable floor area is exempt, subject to heritage protection rules.

All the questions on the thermal insulation page

Masonry in Geneva

Is a permit needed to build a wall in Geneva?

Yes. Geneva law requires a permit to erect a structure, including a wall, a fence or a gate (LCI, Article 1). No work starts before the permit is issued. A site opening notice is then filed 30 days before work starts.

What should I prepare to open up a wall in Geneva?

Attach the plans and photos, then state the dimensions and use you want. The nature of the wall must be checked before the work is confirmed.

All the questions on the masonry page

Interior joinery, cupboards and walk-in wardrobes in Geneva

Which company can study a made-to-measure walk-in wardrobe in Geneva?

MS Contractor SA can prepare your joinery project. Describe the items to store and show the space available to define a suitable layout.

How do I plan storage under a sloping ceiling?

The available heights and depths must be measured. The space in front of the doors also counts, to open the unit and use its contents.

All the questions on the interior joinery, cupboards and walk-in wardrobes page

Parquet in Geneva

What should be checked before removing an old floor covering?

In a building constructed before 1991, the owner has the parts affected by the work checked for amiante, which includes old floor coverings and their adhesives. This check is mandatory in Geneva, even for work that needs no building permit. It is carried out before the old floor is removed.

Which company can lay or restore my parquet in Geneva?

MS Contractor SA studies this work. Say whether you want to keep the existing wood or choose a new parquet, with photos and an approximate floor area.

All the questions on the parquet page

Interior painting in Geneva

Is a permit needed to change the colour of a façade in Geneva?

Geneva law requires a permit to change the colour of a building (LCI, Article 1). Before changing the shade of a façade, the procedure should therefore be checked with the building permit office (Office des autorisations de construire). We prepare with you the details to send, the shades and the surfaces concerned.

What should be checked before sanding old paintwork?

For paint applied before 2006, the absence of lead is checked before any work. A flake of paint can be analysed in a laboratory. If lead is present, sanding and stripping are carried out with suitable precautions against the spread of dust.

All the questions on the interior painting page

Plastering and partitions in Geneva

Is a permit needed to move or build a partition in Geneva?

In a multi-unit building, changing the room layout requires a building permit (LCI, Article 1). These interior alterations follow the accelerated procedure, known as APA, with a legal response time of 30 days. In a villa, interior work is exempt as long as the habitable floor area does not change.

Which company should I contact to build a partition in Geneva?

MS Contractor SA can study the separation and the associated work. Present the plan, how the rooms are used and the equipment planned on the wall.

All the questions on the plastering and partitions page

House, villa and apartment renovation in Geneva

Does an apartment renovation require a permit in Geneva?

In an apartment building, work that goes beyond simple maintenance requires a building permit. This is the rule of the LDTR, the law on demolitions, conversions and renovations of residential buildings, which applies in the first four building zones. Most apartment renovations follow the accelerated procedure, known as APA, with a legal response time of 30 days.

Is a permit needed for work inside a villa?

No, as long as the work stays inside the villa and does not change the habitable floor area, subject to heritage protection rules (LCI, Article 1). As soon as the project affects the volume, the façades or the use of the building, a building permit is required. We look at this point with you from the first visit.

All the questions on the house, villa and apartment renovation page

Underpinning in Geneva

Is a permit needed to open up a wall in a building in Geneva?

Opening up a wall changes the room layout and requires a building permit (LCI, Article 1). These interior alterations follow the accelerated procedure, known as APA. The permit holder informs the tenants in writing, and the co-owners where applicable, before the site opens.

What documents should I attach for underpinning?

Send the plans, studies and available reports. Also describe the planned transformation or the points to be repaired that you have noticed.

All the questions on the underpinning page

Outdoor surfaces in Geneva

Can the base of my current terrace be kept?

Its condition and compatibility with the chosen solution must be examined. Keeping it also depends on the levels and junctions available.

How do I choose a surface around a swimming pool?

Present the uses, the junctions with the pool and the maintenance needs. The characteristics of the material envisaged must be compared in this context.

All the questions on the outdoor surfaces page

Bathroom and plumbing in Geneva

Is a permit needed to renovate a bathroom in Geneva?

In a villa, interior work is exempt from a permit as long as the habitable floor area does not change. In an apartment building, the LDTR requires a building permit for work that goes beyond simple maintenance. These files most often follow the accelerated procedure, with a legal response time of 30 days.

What should be checked before dismantling an old bathroom?

In a building constructed before 1991, the owner has the parts affected by the work checked for amiante, which includes old wall tiles and their adhesives. This check is mandatory in Geneva, whether or not the work requires a permit. It is carried out before dismantling.

All the questions on the bathroom and plumbing page

Blinds, shutters and sun protection in Geneva

How do I choose blinds for several rooms?

Present the light and privacy needs of each room. The choice is then compared with the openings and the installation options.

Can an existing shutter be motorised?

That depends on the system, its condition and the connections available. The equipment must be examined before motorisation is chosen.

All the questions on the blinds, shutters and sun protection page

Earthworks in Geneva

Is a permit needed to change the level of a plot in Geneva?

Yes. Changing the configuration of the ground requires a building permit in the canton of Geneva (LCI, Article 1). No work starts before it is issued, and a site opening notice is filed 30 days before work starts.

What should I show for an earthworks quote in Geneva?

Present the work area, the access and the planned structure. Add the plans and the available information on the ground.

All the questions on the earthworks page

Roofing and roof coverings in Geneva

Is a permit needed to install solar panels on a roof in Geneva?

Solar installations are in principle not subject to a building permit. A permit is still required on cultural property and in sites of national or cantonal importance (LCI, Article 1). With our partners, we check the situation of your roof before planning the installation.

Is a permit needed to create a roof window?

In zone 5, the villa zone, a sloping roof light of less than 1 m² is exempt from a building permit (LCI, Article 1). Above that area, or in another zone, a permit is required.

All the questions on the roofing and roof coverings page