Building permits in Geneva

Building permit, APA and application file in Geneva

Work in Geneva. MS Contractor SA prepares the project details to review the procedures and constraints before work begins.

Our projects
Commercial premises under renovation with an exposed technical ceiling and white walls
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Gathering the documents for your transformation

The procedure to consider depends on the building and the exact nature of the project.

  • Describe the changes you want, distinguishing the interior, the openings and the surroundings.
  • Send the existing plans and the building documents you have.
  • Mention any discussions already under way with the property management agency, the co-owners or the authorities.

We review the project and the missing information to identify the checks to carry out.

The procedures and decisions required remain to be confirmed with the competent bodies.

Present my project

You would like to transform a room, alter an opening or change the layout of premises in Geneva. Describing the project precisely makes it possible to identify the information to gather before a work schedule is chosen.

MS Contractor SA helps you prepare the technical elements. Present the available plans, the changes you want and the discussions already under way with the people involved in the building. The scope of this support and the procedures to examine are defined according to your situation.

Preparing your file in pictures

Illustration of a floor plan on a drawing table with a helmet and ruler
Illustration of a floor plan, a ruler and a helmet on a drawing table. Decorative image, this is not a document or a project by MS Contractor SA.

What the work includes

  • Preparing the project information
  • Coordinating the file
  • Following up the procedures to be defined

The information to gather for the file

1

Describing the planned changes

The structure, façades, volumes or use of the spaces may be affected. The scope must be described before the applicable procedures are examined.

2

Gathering the existing documents

Plans, approvals and correspondence help understand where the project stands. Mention the contact persons and the procedures already under way.

3

Preparing the schedule with the file

The schedule must take into account the necessary stages and the conditions before work starts. No administrative timescale can be deduced from the size of the project alone.

To get started

A few lines and two or three photos help us prepare the visit. The quote still comes with no obligation.

  • Site visit and detailed quote, with no obligation
  • A single contact for the whole project once the permit is granted
  • Trades coordinated according to the work
Request a quote

Frequently asked questions

Geneva’s building act (LCI, Article 1) requires a permit for any new structure, including a wall, a fence or a gate. It also covers work that changes the volume, architecture, colour, room layout or use of a building, as well as demolitions, changes to the configuration of the ground and the creation of parking spaces. No work starts before the permit is issued.

Work inside a villa is exempt when it does not change the habitable floor area, subject to heritage protection rules. In a building zone, the law also exempts very minor structures, for example a movable shed of about 5 m² on the ground and 2 m high, or an uncovered pergola. In an apartment building the rule is different, because the LDTR, Geneva’s law on residential buildings, applies.

The APA is the accelerated procedure. It covers interior alterations to an existing building, work that does not change its general appearance, minor structures and projects in zone 5 with no derogation requested. The definitive application, known as DD, applies to other projects and is published in the official gazette (Feuille d’avis officielle).

The law sets a response time of 30 days under the accelerated procedure and 60 days for a definitive application, counted from the registration of the file (LCI, Article 4). This period can be hanging when the office asks for additional documents. A file that is complete when submitted limits this back and forth.

Work must start within 2 years of the permit being published in the official gazette (Feuille d’avis officielle). After that, the permit lapses. A one-year extension can be requested at least one month before the expiry date, and it is in principle granted only twice (LCI, Article 4).

The file is submitted online on the State of Geneva’s AC-Démat platform, or on paper at the counter of the building permit office (Office des autorisations de construire). For a definitive application, the plans are drawn up and signed by a professionally qualified agent, for example an architect entered in the cantonal register. MS Contractor SA prepares the elements of your project with its architect.

Yes. Every site requires a site opening notice, whether or not it is linked to a building permit. This notice is filed 30 days before work starts with the site inspectorate of the building permit office (RCI, Article 33). If the site encroaches on the public highway, an additional notification is sent to the canton or the municipality.

The owner has the parts affected by the work checked for amiante and PCBs. This check is mandatory even when the work does not require a permit. For paint applied before 2006, the absence of lead is also checked. The result is recorded in the hazardous substances declaration, which is attached to the permit application.

Describe the changes and attach the existing documents. State the approvals obtained and the points still under discussion.

The procedures can cover different matters. How they fit together must be examined for each project before the organisation of the work is decided.

The constraints and the necessary stages must be clarified before the commitments that depend on them. The schedule is defined with the project and the procedures concerned.

You can contact MS Contractor SA, based at Rue de la Servette 88 in Geneva, to prepare the elements of your building project. State the municipality and send the available plans. The procedures and the bodies to approach will be specified according to the changes planned.

It depends on the scope of the transformation, the existing documents, the surveys to complete and the studies required. The quote should separate the support offered, any specialist services and the administrative steps when they are identified.

How we work on site

Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.

The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.

Planning a project in Geneva? MS Contractor SA, a construction company in Geneva, works across the canton, with a no-obligation quote.

Let’s talk about your project

Send us your request with a few photos. These details help us prepare the first discussion. Your quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française