Locality in the canton of Geneva · House, villa and apartment
Building permit, APA and application file in Onex
Before your work, gather the plans and describe the changes you have in mind. If you want to gather the documents for a project, plans and precisely described changes help identify the missing documents. A sketch with the known dimensions makes it possible to discuss the expected result more concretely.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Building work in Onex?
State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. Your quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To gather the documents for a project, your quote request should specify the measurements taken and those still to be confirmed on site. Present the changes planned with the plans and the discussions already under way before scheduling the work. This information helps specify the items in your quote.
Gathering the documents for your transformation
The procedure to consider depends on the building and the exact nature of the project.
- Describe the changes you want, distinguishing the interior, the openings and the surroundings.
- Send the existing plans and the building documents you have.
- Mention any discussions already under way with the property management agency, the co-owners or the authorities.
We review the project and the missing information to identify the checks to carry out.
The procedures and decisions required remain to be confirmed with the competent bodies.
Present my projectDescribing the changes before the permit procedures
Anything affecting the exterior appearance or the structure deserves to be checked. An extension, a conservatory, a covered area, a new opening in the façade, a change of windows that alters the glazing bars or the colour. Inside, removing a load-bearing wall also falls into this category.
Repainting, changing a kitchen or redoing a bathroom without touching the structure generally raises no question. When in doubt, we find out beforehand rather than risk the work being stopped.
Two possible routes with the canton
The canton distinguishes the accelerated procedure (APA), for small-scale projects, from the definitive application (DD) for larger constructions. One or the other applies depending on the size and impact of the project. This mainly changes the number of documents to provide and the waiting time.
An application includes plans, sections, a description and sometimes photos of the existing situation. Depending on the project, an architect or an engineer must sign certain documents. We tell you from the start who does what.
The co-ownership and the neighbours
For a project in a co-ownership (PPE) in Onex, the status of the elements and the necessary agreements must be clarified with the building’s contacts. Changes to a balcony, blinds or a shared wall are described with plans and photos. The procedures are defined according to the planned intervention.
For a villa, the distances to the plot boundaries and the neighbours’ views matter. A well-presented project avoids many objections.
Linking the application and the work
For a villa in the upper part of Onex or an apartment in a co-ownership (PPE), the procedures are not the same. We explain simply which ones apply to your case.
We prepare the work in parallel with the processing of the application. When the permit arrives, the schedule is ready and the orders can go out. You do not have two projects to follow, an administrative one and a technical one, but just one.
Explain in a few lines what you have in mind for your home in Onex. We look together at what it involves before any plan is drawn.
What the works include
Depending on the age of the building and its condition, some items drop out and others are added.
- Identifying the approvals to obtain
- Checking the scope subject to a permit
- Preparing the useful technical information
- Coordination before the works start
For business premises in Onex, we plan the work to limit closure.
Frequently asked questions about building permits in Onex
We gather the plans and technical documents with the architect or engineer when one is needed.
Yes. A small job is prepared like a big one. We come and see before giving you an answer.
It varies depending on the procedure. We take it into account in the schedule so as not to hold up the works.
The procedures depend on the work and the building. Present the changes considered and the available documents so that the applicable conditions can be checked before the works.
How we work in Onex
Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.
The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.
Planning a project in Onex? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
