Locality in the canton of Geneva · House, villa and apartment
Building permit, APA and application file in Plan-les-Ouates
Before your work, gather the plans and describe the changes you have in mind. If you want to prepare an interior alteration, the elements concerned and the building’s rules must be examined together with the planned changes. Other work planned in the same area can change the preparation and the sequence of trades.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Building work in Plan-les-Ouates?
Explain your project or work to us in a few lines. A site visit serves as the basis for the quote. Your quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare an interior alteration, your quote request should specify the work planned with the other trades and how it connects. Present the planned changes with the plans and any discussions already under way before scheduling the work. This information helps specify the items in your quote.
Gathering the documents for your transformation
The procedure to consider depends on the building and the exact nature of the project.
- Describe the changes you want, distinguishing the interior, the openings and the surroundings.
- Send the existing plans and the building documents you have.
- Mention any discussions already under way with the property management agency, the co-owners or the authorities.
We review the project and the missing information to identify the checks to carry out.
The procedures and decisions required remain to be confirmed with the competent bodies.
Present my projectDescribing the changes before the permit procedures
Anything that changes the volume or exterior appearance of a house is worth asking about. An extension, a conservatory, a dormer, a carport, a pool, a slightly high boundary wall. A change of façade colour or window type may also be concerned depending on the zone.
An interior renovation must be examined together with the elements affected and the building’s rules. The structure, the shared installations and the conditions of use can influence the procedures. Describe the planned changes so they can be checked before the stages of the work are set.
Simplified procedure or full application to the canton
The canton distinguishes several routes. Small works often go through a simplified, quicker procedure. Larger projects, such as a habitable extension, follow a full application with architect’s plans and longer lead times.
We help you identify the right route. When an architect is needed to sign the plans, we work with them and prepare the technical parts of the application.
The processing time varies greatly depending on the procedure. We build it into the overall schedule so that the tradespeople are not booked too early.
The municipality’s particular features
Plan-les-Ouates has villa zones, recent dense neighbourhoods and farmland to the south, towards the border. Each zone has its own rules on building envelope and distance to the boundaries. In the old hamlets, the appearance of roofs and façades is more closely monitored.
So before drawing anything, we check the zoning of your plot. This avoids designing an extension that could never be approved.
While the application is being processed
Once the application has been submitted, cantonal departments may ask questions or request additional information. We remain on hand to respond quickly. The neighbours can also consult the project, which is why it is worth talking to them beforehand.
Work only starts once the permit has become final. In the meantime, we refine the schedule and the material orders. Tell us about your idea and we will look together at what it involves in Plan-les-Ouates.
What the works include
Every home is different. The quote only includes the useful items once the actual condition has been seen.
- Identifying the approvals to obtain
- Checking the scope subject to a permit
- Preparing the useful technical information
- Coordination before the works start
Shops and practices in Plan-les-Ouates can also entrust us with this type of work. We adapt to their activity.
Frequently asked questions about building permits in Plan-les-Ouates
The procedures depend on the work and the building. Present the changes considered and the available documents so that the applicable conditions can be checked before the works.
We gather the plans and technical documents with the architect or engineer when one is needed.
It varies depending on the procedure. We take it into account in the schedule so as not to hold up the works.
We look at the rooms concerned, take measurements and listen to what you want. The quote then follows in writing.
How we work in Plan-les-Ouates
Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.
The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.
Planning a project in Plan-les-Ouates? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.