Locality in the canton of Geneva · House, villa and apartment
Interior demolition and dismantling in Onex
The scope of your removal and demolition project in Onex is defined with your needs and the existing elements. If you want to organise dismantling before a renovation, the sequence of interventions must preserve the elements being kept and prepare the following work. The necessary work and the options you want to compare are worth presenting separately.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Do you live in Onex?
State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. You receive a written quote, with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To organise dismantling before a renovation, your quote request should specify the priority items and the options to study separately. Distinguish the elements to remove from those to protect, with the plans and available surveys. This information helps specify the items in your quote.
Defining what needs to be dismantled
Overall photos make it possible to distinguish the elements to remove from those to protect.
- Identify the partitions, equipment or coverings to remove.
- State the elements you want to salvage or keep in place.
- Show the access routes, stairs and spaces available for taking out the materials.
The visit makes it possible to examine the substrates, the neighbouring installations and the protection to plan.
Work on the structure or on suspect materials requires an appropriate assessment before work begins.
Present my projectIdentifying the elements to remove and to preserve
The aim of interior demolition is not to break everything. We remove what must go while preserving what stays. A sound screed, a ceiling in good condition, pipes that can still be used. Every element kept means less work later on.
Before touching a partition, we check what it contains. Cables, pipes, a ventilation duct. In buildings from the 1960s, there are sometimes routes that appear on no plan.
We also carefully dismantle what can be used again. Interior doors, radiators, kitchen appliances still in good order. Some clients give them away or sell them, and that is so much less to throw away.
Materials to identify before starting
Some tile adhesives, floor tiles or plasters in buildings from before 1991 may contain amiante. We do not start blind. If there is any doubt, a survey is carried out before the work, and the elements concerned are removed by an authorised company according to cantonal rules.
The checking stages and the preliminary interventions must be built into the schedule according to the materials and the project. The removal work is then defined with the protection and the contractors required.
Dust, noise and common areas
We put protection in the stairwell and the lift. We close the doorways with sealed sheeting. Noisy work is done during the hours set by the building regulations. Rubble goes down in closed bags, never loose.
In a villa, it is simpler. A skip in the driveway, direct access through the garden. We still make sure not to mark the paving or the lawn.
In the large buildings of Onex, we also let the caretaker know and post the dates of the work in the entrance hall. Neighbours accept noise more easily when they know how long it will last.
Sorted skips, a home swept clean
Wood, metal, plaster, mineral rubble, special waste. Everything is sorted and taken to the appropriate channels in Geneva. You get back a home that has been emptied, swept and is ready for what comes next.
Tell us what needs to go from your home. We will come and look at the access and estimate the volume to be removed.
The most common items
Not everything is necessarily needed at your home. We only keep what is useful after seeing the premises.
- Removing the elements planned in the project
- Sorting and removing materials
- Preparing the substrates for what comes next
- Protecting the areas being kept
Frequently asked questions about demolition and dismantling in Onex
We sort it and remove it to the planned channels. The home is left clean.
It is better to check first whether it is load-bearing or whether ducts run through it. We check this on site.
MS Contractor SA coordinates the interventions carried out by its teams and partners. Once the permit is granted, you have one contact for following up the project.
In Geneva, an amiante survey before work must be carried out for buildings or parts of buildings built before 1991. The materials concerned are identified before any removal or demolition is started.
How we work in Onex
Our partners shut off and secure the water, electricity and gas, then we protect what must stay in place. Dismantling goes from top to bottom, ceilings, partitions, then floors.
A load-bearing wall is only opened after propping, following the engineer’s instructions. Materials are sorted by type before removal.
Planning a project in Onex? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
