Interior demolition and dismantling in Vernier

MS Contractor SA studies your removal and demolition project in Vernier together with the elements and installations already in place. If you want to organise dismantling before a renovation, the sequence of interventions must preserve the elements being kept and prepare the following work. The elements and objects around the work area must be mentioned so that the protection can be prepared.

Our projects
Interior demolition, partitions removed and rubble before rebuilding

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Building work in Vernier?

Send us a description and two or three photos. The quote is made after seeing the site. Your quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To organise dismantling before a renovation, your quote request should specify the neighbouring elements to protect and the access to keep around them. Distinguish the elements to remove from those to protect, with the plans and available surveys. This information helps specify the items in your quote.

Defining what needs to be dismantled

Overall photos make it possible to distinguish the elements to remove from those to protect.

  • Identify the partitions, equipment or coverings to remove.
  • State the elements you want to salvage or keep in place.
  • Show the access routes, stairs and spaces available for taking out the materials.

The visit makes it possible to examine the substrates, the neighbouring installations and the protection to plan.

Work on the structure or on suspect materials requires an appropriate assessment before work begins.

Present my project

Identifying the elements to remove and to preserve

In a building, the access routes and means of removal must be recorded before any removal. Specify the floor, the dimensions of the lift and the rules given by the property management agency. The protection and the hours are prepared with the common areas actually used.

Every bag of rubble is closed before it goes down the stairs. Nothing is left in the stairwell in the evening. It is a small detail for us, but it is what the neighbours remember.

Identifying what must not be broken

A partition can hide an electrical conduit, a water pipe or a shared ventilation duct. In buildings from the 1960s and 1970s, some walls that look light are part of the structure. We probe, have our partners cut off the water and power to the area, then demolish.

For buildings from that period, we also have tile adhesives, floor tiles or suspect sprayed coatings analysed before touching them. If a material contains amiante, its removal follows a separate procedure with an authorised company.

Doors, parquet and radiators to set aside

Some elements deserve better than the skip. Old doors, parquet that is still sound or cast-iron radiators can be carefully removed and then refitted. In a villa, kitchen units are sometimes kept for a garage or laundry room. We discuss this during the visit to find out what you want to keep.

Careful removal takes a little longer than rough demolition. Yet it avoids buying new items to replace what was still good.

Separate channels for each material

Wood, metal, plaster, concrete and mixed waste are separated on site and then removed to the appropriate channels. For a house with a garden, a skip can be placed in front of the entrance. In a building, we organise rotations with a van. Tell us what needs to be removed and we will plan the simplest method for your home.

What the works include

This list gives an idea of the work. The exact content depends on what we find on site.

  • Protecting the areas being kept
  • Removing the elements planned in the project
  • Sorting and removing materials
  • Preparing the substrates for what comes next

This service also concerns shops, pharmacies and offices in Vernier.

Frequently asked questions about demolition and dismantling in Vernier

We sort it and remove it to the planned channels. The home is left clean.

The time needed to prepare the quote depends on the checks and the trades concerned. It is clarified with the information gathered during the visit.

It is better to check first whether it is load-bearing or whether ducts run through it. We check this on site.

In Geneva, an amiante survey before work must be carried out for buildings or parts of buildings built before 1991. The materials concerned are identified before any removal or demolition is started.

How we work in Vernier

Our partners shut off and secure the water, electricity and gas, then we protect what must stay in place. Dismantling goes from top to bottom, ceilings, partitions, then floors.

A load-bearing wall is only opened after propping, following the engineer’s instructions. Materials are sorted by type before removal.

Planning a project in Vernier? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

What next?

If you already have a timeframe in mind, tell us. We organise the work around your constraints. You receive a written quote, with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote