MS Contractor SA

Locality in the canton of Geneva · House, villa and apartment

Underpinning in Vernier

For your underpinning work in Vernier, start from the elements to change and those you want to keep. If you want to convert a space near the foundations, the neighbouring structures and supports require appropriate checks before the work is defined. Points still unknown must be identified before a final scope is chosen.

Our projects
Structural work, reinforcement of a concrete slab before pouring

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Is your home in Vernier?

State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To convert a space near the foundations, your quote request should specify the confirmed information and the questions to check during the visit. Present the available plans and studies to prepare the phasing with the structural specialists. With this information, MS Contractor SA can specify the scope to be priced.

Documenting the signs observed before underpinning

A precise description helps prepare the review, without drawing conclusions remotely about their cause.

  • Locate the cracks, movement or subsidence and say when you noticed them.
  • Provide dated photos and any technical reports already available.
  • Describe previous work and the access conditions to the areas affected.

The visit is used to record the visible signs and organise the useful investigations.

The choice of underpinning method depends on an appropriate study of the building and the ground.

Present my project

Preparing the study of the supports and structure

A movement can be studied in relation to changes in soil moisture, a leak or neighbouring structures. None of these factors should be assumed from the location of the land alone. Observations and investigations make it possible to look for the cause before an intervention is sized.

For your project in Vernier, the nature and condition of the foundations must be checked. Crack monitoring and investigations are defined according to the observations and the necessary study.

Diagnosis before the work

A civil engineer studies the building. They may ask for trial pits to establish the nature of the soil and the depth of the existing footings. The method is chosen on this basis. We never start underpinning without this calculation.

Alternating sections of one metre

The most common technique is to dig under the foundation in sections of about one metre, alternately. Concrete is poured under each section before moving on to the next. Only a short section of wall is ever without support at any one time.

Micropiles can be among the solutions studied to transfer loads to depth. Their feasibility depends on the ground, the loads and the access available. The dimensions of the equipment and the installation constraints must be examined for the works concerned.

Throughout the work, we regularly read the tell-tales and a few measuring points on the façades. If movement appears, we stop and adjust with the engineer.

Going lower for a plant room

Some owners want to gain a cellar or a plant room under their house. We apply the same logic of alternating passes. We take the foundations down before removing the soil in the centre. It is a long project that requires a permit and precise monitoring.

Once the foundations have been underpinned, we fill the cracks and redo the finishes. Send us photos of the cracks, with an object for scale, and we will arrange a first visit.

What the works can include in Vernier

We will not sell you what you do not need. The visit is there precisely to check this.

  • Strengthening existing structures
  • Localised foundation underpinning
  • Coordination with the structural study
  • Propping and preliminary securing

We also work for businesses in Vernier. Shop, pharmacy or office, the works are organised around opening hours.

Frequently asked questions about underpinning in Vernier

The time needed to prepare the quote depends on the checks and the trades concerned. It is clarified with the information gathered during the visit.

This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.

Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.

Yes. We underpin the foundations in sections so that the house remains supported at all times.

How we work in Vernier

Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.

Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.

Planning a project in Vernier? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Book an appointment in Vernier

You can also send us photos before the visit. This helps us come with the right questions. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française