Locality in the canton of Geneva · House, villa and apartment
Underpinning in the city of Geneva
Present your underpinning work in Geneva, distinguishing the priorities and the elements to keep. If you want to convert a space near the foundations, the neighbouring structures and supports require appropriate checks before the work is defined. Known previous interventions can help understand the structures and the limits of the underpinning.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Building work in Geneva?
Tell us what you want to redo. We come to see the home before pricing anything. The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To convert a space near the foundations, your quote request should specify the known previous work and the documents you have. Present the available plans and studies to prepare the phasing with the structural specialists. With this information, MS Contractor SA can specify the scope to be priced.
Documenting the signs observed before underpinning
A precise description helps prepare the review, without drawing conclusions remotely about their cause.
- Locate the cracks, movement or subsidence and say when you noticed them.
- Provide dated photos and any technical reports already available.
- Describe previous work and the access conditions to the areas affected.
The visit is used to record the visible signs and organise the useful investigations.
The choice of underpinning method depends on an appropriate study of the building and the ground.
Present my projectPreparing the study of the supports and structure
Observed movements must be studied together with the ground, the foundations and nearby structures. Mention any known changes on the land and around the building. The presence of clay or the influence of a tree should not be deduced from the address alone.
Crack monitoring and investigations are defined according to the building and the observations. A known change is useful to present, but it is not enough to choose the underpinning method. The necessary checks and their schedule are specified with the study.
The techniques used
The traditional method is to dig under the existing footing in short sections. Concrete is poured, left to harden, and then we move on to the next section. Never two neighbouring sections at the same time.
When good ground is deep, micropiles can be drilled. They reach a deeper bearing layer and take up the load of the wall. The engineer chooses the technique according to the ground, the load and the access.
Gaining a level under a villa
If you are considering converting a cellar or a crawl space, present the height available and the use you want. Feasibility and any underpinning depend on the structure, the ground and the elements concerned.
The works require careful propping, water management and new waterproofing against the buried walls. A permit is often needed, especially if the use of the space changes.
Protecting the neighbours and monitoring the works
In a row of terraced houses, the foundations sometimes touch. We carry out a condition survey at the neighbours’ before starting. During the work, we measure movements regularly. Markers fixed to the façades make it possible to see the slightest settlement to the millimetre.
Finishing repairs must be prepared together with the structural monitoring and site conditions. The necessary observations and the timing of the intervention are defined according to the study. A uniform seasonal waiting period is not enough to confirm stability before the surfaces are repaired.
If your house has cracks, describe them with a few photos. We come to look, and arrange the study if it proves necessary.
What we can take care of
This list gives an idea of the work. The exact content depends on what we find on site.
- Propping and preliminary securing
- Strengthening existing structures
- Localised foundation underpinning
- Coordination with the structural study
Shops and practices in Geneva can also entrust us with this type of work. We adapt to their activity.
Frequently asked questions about underpinning in Geneva
Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.
The method is determined by the study of the building and the ground. Underpinning in sections may be chosen in some cases, with phasing and support measures defined for the works. It cannot be confirmed before these checks.
This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.
Whether you can stay in the home must be studied before the works. It depends on the work, the access and the safety measures planned. Specify your situation in the quote request so that the organisation and any periods of temporary rehousing can be prepared.
How we work on site
Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.
Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.
Planning a project in Geneva? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
