Locality in the canton of Geneva · House, villa and apartment
Building permit, APA and application file in the city of Geneva
Before your work, gather the plans and describe the changes you are considering. If you want to prepare an interior alteration, the elements concerned and the building rules must be examined together with the changes considered. A sketch with the known dimensions makes it possible to discuss the expected result more concretely.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Do you live in Geneva?
Tell us what you want to redo. We come to see the home before pricing anything. The quote still comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare an interior alteration, your quote request should specify the measurements taken and those still to be confirmed on site. Present the changes considered with the plans and any discussions already under way before planning the works. This information helps specify the items in your quote.
Gathering the documents for your transformation
The procedure to consider depends on the building and the exact nature of the project.
- Describe the changes you want, distinguishing the interior, the openings and the surroundings.
- Send the existing plans and the building documents you have.
- Mention any discussions already under way with the property management agency, the co-owners or the authorities.
We review the project and the missing information to identify the checks to carry out.
The procedures and decisions required remain to be confirmed with the competent bodies.
Present my projectDescribing the changes before the permit procedures
Describe the work you are considering and attach the available documents on your property. Interventions on the structure, the façades or the use of the spaces help specify the procedures to check before the schedule is set.
The procedure and the documents to prepare depend on the project and the authorities concerned. The administrative stages must be checked before work starts and taken into account in the schedule. Their timescale cannot be deduced from the size of the work alone.
Old buildings and protected areas
The Old Town and several 19th-century ensembles are closely monitored by the heritage services. Shutter colour, window shape, roofing material. Details that seem minor can be subject to precise conditions.
Plans, photos and information on materials are prepared according to the documents required for the file. Their consistency must be checked with the project. Requests for additional information can arise even when the initial documents have been prepared carefully.
Co-ownership, property management agency and neighbours
In a co-owned or rented property, the necessary approvals must be examined according to the elements and documents of the project. Present your exchanges with the property management agency, the owner or the contact people to prepare a clear description of the work.
Talking with the neighbours can help present the interventions and their practical effects. State the discussions already under way and any constraints mentioned so that the organisation of the works can be prepared.
From the file to the works
Once the permit has been obtained, the conditions it contains must be respected on site. Our teams work with this document to hand. If a change becomes necessary along the way, we first check whether it requires an additional application.
Describe your project to us. We come to see the home and tell you what needs to be requested, and from whom.
What we can take care of
This list gives an idea of the work. The exact content depends on what we find on site.
- Preparing the useful technical information
- Coordination before the works start
- Identifying the approvals to obtain
- Checking the scope subject to a permit
This service also concerns shops, pharmacies and offices in Geneva.
Frequently asked questions about building permits in Geneva
We gather the plans and technical documents with the architect or engineer when one is needed.
Yes. A small job is prepared like a big one. We come and see before giving you an answer.
It varies depending on the procedure. We take it into account in the schedule so as not to hold up the works.
The procedures depend on the work and the building. Present the changes considered and the available documents so that the applicable conditions can be checked before the works.
How we work on site
Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.
The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.
Planning a project in Geneva? MS Contractor SA, a building and renovation company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
