MS Contractor SA

Locality in the canton of Geneva · House, villa and apartment

Building permit, APA and application file in Cologny

Before your work, gather the plans and describe the changes you have in mind. If you want to alter an opening in the building, the position and appearance of the opening are part of the information to prepare with the building. The useful steps depend on the scope and the junctions between the different jobs.

Our projects
Commercial premises under renovation with an exposed technical ceiling and white walls

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Do you live in Cologny?

Describe the home and what you expect from the work. We come and see before drafting the quote. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To alter an opening in the building, your quote request should specify the other work your project depends on and the limits of each job. Present the planned changes with the plans and any discussions already under way before scheduling the work. The quote can then distinguish the work to go ahead with from the options to discuss.

Gathering the documents for your transformation

The procedure to consider depends on the building and the exact nature of the project.

  • Describe the changes you want, distinguishing the interior, the openings and the surroundings.
  • Send the existing plans and the building documents you have.
  • Mention any discussions already under way with the property management agency, the co-owners or the authorities.

We review the project and the missing information to identify the checks to carry out.

The procedures and decisions required remain to be confirmed with the competent bodies.

Present my project

Describing the changes before the permit procedures

As a general rule, anything that changes the exterior appearance or volume of a building must be authorised. An extension, an extra storey, a pool, a masonry boundary wall, a window change that alters the façade. Purely interior work that does not affect the structure is often exempt.

Doubt is common. We look at your project and the situation of the plot, then tell you whether a fast-track procedure or a full application is needed. This distinction makes a clear difference to the lead times.

For co-ownership (PPE) apartments, another step is often added. The co-owners’ meeting sometimes has to give its agreement even before the application is submitted, for example for a conservatory on a balcony.

A municipality where the landscape matters

The municipality occupies a very exposed hillside, visible from the harbour and the opposite shore. The bodies that review applications pay close attention to volumes, colours and trees. A plot may also be affected by a protected area or by its proximity to the lake.

So we anticipate the points that will draw comments. Height relative to natural ground level, felling a tree, the colour of the tiles, the footprint of a terrace. An application that answers these questions from the outset comes back less often with requests for more information.

What we prepare for you

A survey of the existing building, site and elevation plans, sections, a specification of the materials and photos of the site. We work with architects and engineers when the project requires it, for example for structural work or a cantilevered extension on the slope.

We then follow the application through to the decision. If neighbours raise questions or the department requests a change, we adapt the plans with you.

Not starting too early

Work started without a permit can be halted and you may be required to restore the site to its previous state. We set the work schedule around the realistic decision date, not around the wish to get started.

Tell us what you have in mind for your house in Cologny. We will tell you which procedures to plan and in what order.

The most common items

We will not sell you what you do not need. The visit is there precisely to check this.

  • Coordination before the works start
  • Identifying the approvals to obtain
  • Checking the scope subject to a permit
  • Preparing the useful technical information

For business premises in Cologny, we plan the work to limit closure.

Frequently asked questions about building permits in Cologny

The time needed to prepare the quote depends on the checks and the trades concerned. It is clarified with the information gathered during the visit.

It varies depending on the procedure. We take it into account in the schedule so as not to hold up the works.

The procedures depend on the work and the building. Present the changes considered and the available documents so that the applicable conditions can be checked before the works.

We gather the plans and technical documents with the architect or engineer when one is needed.

How we work in Cologny

Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.

The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.

Planning a project in Cologny? MS Contractor SA, a general building contractor in Geneva, works in houses, villas and apartments, with a no-obligation quote.

To go further

The simplest way is to call us or fill in the form. We agree on a time to come round. You receive a written quote, with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française