Locality in the canton of Geneva · House, villa and apartment
Building permit, APA and application file in Choulex
Before your work, gather the plans and describe the changes you have in mind. If you want to add an outdoor structure, its use, position and dimensions make it possible to prepare the necessary checks. Scheduling constraints should be stated without presuming the duration of the work.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Do you live in Choulex?
Send us a description and two or three photos. The quote is made after seeing the site. The quote still comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To add an outdoor structure, your quote request should specify the key dates and the periods when access is possible. Present the planned changes with the plans and any discussions already under way before the work is scheduled. With this information, MS Contractor SA can specify the scope to be priced.
Gathering the documents for your transformation
The procedure to consider depends on the building and the exact nature of the project.
- Describe the changes you want, distinguishing the interior, the openings and the surroundings.
- Send the existing plans and the building documents you have.
- Mention any discussions already under way with the property management agency, the co-owners or the authorities.
We review the project and the missing information to identify the checks to carry out.
The procedures and decisions required remain to be confirmed with the competent bodies.
Present my projectDescribing the changes before the permit procedures
Ordinary interior work generally does not require a permit. As soon as the volume, the exterior appearance, the structure or the use of a room is affected, the question arises. A garden shelter, a swimming pool, a covered terrace or a boundary wall may also be concerned.
We look at your project with you and check the rules that apply to the plot. This is the first thing to do, even before drawing.
Agricultural zone, village or villa zone
A large part of the municipality’s territory is agricultural. Building or converting outside the building zone is subject to stricter rules. The possibilities for extension there are limited and several cantonal departments give their opinion.
In the heart of the village, old houses may be listed in the heritage inventory or located in a protected area. The materials, colours and shape of the openings are then examined closely. In the villa zone, the distances to the boundaries, the height and the density guide the project.
Putting together a complete application
Each missing document requested by the office adds several weeks. We prepare the site plans, the plans, sections and elevations, the description of the materials and the energy documents when they are required. For simple projects, a fast-track procedure exists. Larger projects go through an ordinary procedure with publication and a comment period for the neighbours.
Talking about the project with your neighbours before submitting it often avoids unnecessary objections. A plan explained around a table goes down better than a notice discovered in the official gazette.
From permit to site
Once the permit is granted, the conditions it contains must be followed on site. We include them in the schedule and in the material orders. The start of work is notified as required.
If you have a project in Choulex and do not know where to start, explain it to us. We look together at what is possible on your plot.
The work possible in Choulex
Every home is different. The quote only includes the useful items once the actual condition has been seen.
- Preparing the useful technical information
- Coordination before the works start
- Identifying the approvals to obtain
- Checking the scope subject to a permit
For business premises in Choulex, we plan the work to limit closure.
Frequently asked questions about building permits in Choulex
Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.
We gather the plans and technical documents with the architect or engineer when one is needed.
The stages and timeframes depend on the application. The work schedule is prepared with the formalities and conditions required before starting.
Whether you can stay in the home must be studied before the works. It depends on the work, the access and the safety measures planned. Specify your situation in the quote request so that the organisation and any periods of temporary rehousing can be prepared.
How we work in Choulex
Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.
The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.
Planning a project in Choulex? MS Contractor SA, a building and renovation company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
