Locality in the canton of Geneva · House, villa and apartment
Building permit, APA and application file in Jussy
Before your work, gather the plans and describe the changes you have in mind. If you want to prepare an interior conversion, the structures concerned and the building’s rules must be examined with the changes you have in mind. Comparing offers requires the same scope and the same limits in each quote.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Is your home in Jussy?
Send us a description and two or three photos. The quote is made after seeing the site. The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare an interior conversion, your quote request should specify the supplies, repairs and finishes that must appear in the quote. Present the planned changes with the plans and any discussions already under way before the work is scheduled. This information helps specify the items in your quote.
Gathering the documents for your transformation
The procedure to consider depends on the building and the exact nature of the project.
- Describe the changes you want, distinguishing the interior, the openings and the surroundings.
- Send the existing plans and the building documents you have.
- Mention any discussions already under way with the property management agency, the co-owners or the authorities.
We review the project and the missing information to identify the checks to carry out.
The procedures and decisions required remain to be confirmed with the competent bodies.
Present my projectDescribing the changes before the permit procedures
Everything starts with the status of the land. Building zone, agricultural zone, forest edge or protected area. We consult the land register and the cantonal geoportal to find out the zone, the distances to the boundaries and the registered easements.
Outside the building zone, the possibilities are very tightly regulated. Converting a barn into a home or extending an old farmhouse requires a careful examination by several departments. We tell you frankly from the start if a project has little chance of being approved.
Small works or a major project
In Geneva, small works often go through a fast-track procedure. Changing windows in a way that alters their appearance, installing solar panels, creating a roof window or redoing a façade in a different colour may fall within this scope. Larger projects, such as an extension or a raised storey, go through the full application.
A project sometimes seems small and still has to take the long route, for example when it affects a listed building or is located in the agricultural zone. The timescale is not the same. We take this into account in the schedule so that the team is not planned on site before the go-ahead has arrived.
Plans, sections and land register extract
An application that comes back for additional information loses weeks. We prepare the plans of the existing building and the project, the sections, the elevations, a land register extract and the photos. Depending on the case, an energy statement or details on water drainage must be added.
For an old house in the village, we attach details of the planned materials. Tiles, render colours, joinery. The departments appreciate a project that respects the character of the neighbouring buildings.
During and after the processing
We follow the application, respond to requests for additional information and keep you informed. Once the permit is granted, we respect its conditions on site. If you have an idea for an extension or a conversion, show us the plot and we will look together at the path to follow.
The work possible in Jussy
Depending on the age of the building and its condition, some items drop out and others are added.
- Identifying the approvals to obtain
- Checking the scope subject to a permit
- Preparing the useful technical information
- Coordination before the works start
For business premises in Jussy, we plan the work to limit closure.
Frequently asked questions about building permits in Jussy
We gather the plans and technical documents with the architect or engineer when one is needed.
Yes. A small job is prepared like a big one. We come and see before giving you an answer.
The stages and timeframes depend on the application. The work schedule is prepared with the formalities and conditions required before starting.
Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.
How we work in Jussy
Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.
The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.
Planning a project in Jussy? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
