MS Contractor SA

Locality in the canton of Geneva · House, villa and apartment

Building permit, APA and application file in Gy

Before your work, gather the plans and describe the changes you have in mind. If you want to prepare an interior conversion, the structures concerned and the building’s rules must be examined with the changes you have in mind. If the premises remain occupied, the passages and uses to be maintained must be specified.

Our projects
Commercial premises under renovation with an exposed technical ceiling and white walls

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

A project in Gy?

A word about the home and what you want to change is enough to get started. The rest is seen on site. Your quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To prepare an interior conversion, your quote request should specify the uses that must remain possible during the work. Present the planned changes with the plans and any discussions already under way before the work is scheduled. This information helps specify the items in your quote.

Gathering the documents for your transformation

The procedure to consider depends on the building and the exact nature of the project.

  • Describe the changes you want, distinguishing the interior, the openings and the surroundings.
  • Send the existing plans and the building documents you have.
  • Mention any discussions already under way with the property management agency, the co-owners or the authorities.

We review the project and the missing information to identify the checks to carry out.

The procedures and decisions required remain to be confirmed with the competent bodies.

Present my project

Describing the changes before the permit procedures

The Geneva land register, which can be consulted on the canton’s geoportal, shows the designated use of each plot. Villa zone, village zone, agricultural zone. Building rights and constraints differ from one zone to another.

In the agricultural zone, the possibilities for converting an existing building are limited and regulated. A farm building does not become a home without careful examination. We check these points before drawing a single plan.

Small application or full application

For modest work, such as replacing windows with a change of appearance, a small annex or an enclosed pergola, the canton often provides a fast-track procedure. For an extension, a raised storey or a new volume, it is generally a full application, which takes longer.

The application includes plans, sections, elevations, a site plan and sometimes an energy statement. It goes through several departments that give their opinion. The municipality is consulted too.

Surveys, plans and submission of the application

The application is prepared with the plans of the existing building and the description of the changes. The professionals to involve depend on the application and the applicable requirements. Clear documents make the review easier, but additional information may still be requested during processing.

During processing, we respond to requests for additional information. Once the permit has been issued and has become final, the work can be scheduled.

Work that seems minor

The outdoor unit of a heat pump, solar panels, a garden shed or a high fence may also be concerned. Some require a simple notification, others a permit. It is wiser to ask before buying the equipment.

In Gy, as elsewhere in the canton, work started without a permit can lead to the site being stopped. Describe what you want to do and we will tell you which procedure applies.

What we can take care of

Depending on the age of the building and its condition, some items drop out and others are added.

  • Identifying the approvals to obtain
  • Checking the scope subject to a permit
  • Preparing the useful technical information
  • Coordination before the works start

This service also concerns shops, pharmacies and offices in Gy.

Frequently asked questions about building permits in Gy

We gather the plans and technical documents with the architect or engineer when one is needed.

Yes. A small job is prepared like a big one. We come and see before giving you an answer.

The stages and timeframes depend on the application. The work schedule is prepared with the formalities and conditions required before starting.

Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.

How we work in Gy

Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.

The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.

Planning a project in Gy? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

What next?

If you already have a timeframe in mind, tell us. We organise the work around your constraints. You receive a written quote, with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française