MS Contractor SA

Locality in the canton of Geneva · House, villa and apartment

Earthworks company in Gy, excavations and trenches

The scope of your earthworks project in Gy is defined with your needs and the existing structures. If you want to organise the excavation and backfill, the volumes to be moved and the traffic routes are part of preparing the work. If the premises remain occupied, the passages and uses to be maintained must be specified.

Our projects
Earthworks, excavator and spoil skips on a site

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Is your home in Gy?

Explain your project or work to us in a few lines. A site visit serves as the basis for the quote. Your quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To organise the excavation and backfill, your quote request should specify the uses that must remain possible during the work. Attach the plan and the known information on the utility networks to prepare the excavations and the access. With this information, MS Contractor SA can specify the scope to be priced.

Describing the ground before earthworks

Access and the future use of the land help prepare a first estimate.

  • Explain what you want to create and give the approximate dimensions of the area.
  • Photograph the slope, the route from the street and the neighbouring buildings.
  • Point out known utility networks and any available drainage plans.

On site, the review covers in particular the levels, access and options for removing materials.

The nature of the subsoil and buried networks may require further checks.

Present my project

Examining the ground and access before the work

Clay soil swells when wet and shrinks in summer. An excavation left open in the rain quickly turns into a quagmire and its sides can collapse. For a major project, a geotechnical study shows the bearing capacity and whether there is water.

We also check the buried networks. A water pipe or an electric cable sometimes crosses the garden without anyone remembering it. The utility companies' plans and a survey on site avoid tearing out a cable.

Access and space for the machines

On a country plot, there is often space. But the digger and the lorries still have to get in without churning up the lawn or the path. We plan ground protection mats if the ground is soft and choose the size of machine according to the gate and the trees to be preserved.

The roads around Gy are narrow and shared with tractors. Lorry trips are planned to limit the disturbance.

What to do with the soil

The topsoil is stripped and set aside. It is spread again at the end of the work for returfing or replanting. Excavated material that cannot be reused goes to an authorised landfill. Storing too much soil at the edge of the excavation loads the slopes and increases the risk of collapse.

When the plot slopes slightly, the excavated soil can sometimes be used to shape a terrace or soften a bank. This is decided before the work begins.

Slopes, shoring and backfill

Beyond a certain depth, the sides of the excavation are sloped or shored to protect those working at the bottom. Backfilling around a structure is done in compacted layers, with draining gravel against the buried walls.

A properly backfilled excavation stays put. An excavation filled in loosely settles for years. Send us the plans or a description of your project and we will come and look at the site.

The work possible in Gy

Every home is different. The quote only includes the useful items once the actual condition has been seen.

  • Excavations and levelling
  • Preparing foundations and exterior structures
  • Routes for underground services
  • Backfilling and preparing the surroundings

Frequently asked questions about earthworks in Gy

Yes. We locate the buried pipes and cables before starting the excavator.

Some of it can stay on the plot. The rest goes to landfill according to its quality.

Yes. Temporary retaining work is sometimes needed. We see this during the visit.

Whether you can stay in the home must be studied before the works. It depends on the work, the access and the safety measures planned. Specify your situation in the quote request so that the organisation and any periods of temporary rehousing can be prepared.

How we work in Gy

We ask for the plans of the underground services before setting out the excavation. The topsoil is set aside, then we dig in layers down to firm ground.

The slopes are cut to a stable angle and the bottom of the excavation is levelled. The soil is removed or kept for backfilling.

Planning a project in Gy? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Arrange a visit in Gy

If you already have a timeframe in mind, tell us. We organise the work around your constraints. The quote still comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française