Locality in the canton of Geneva · House, villa and apartment
Masonry company in Gy, walls, openings and slabs
The scope of your masonry work in Gy is defined with your needs and the existing structures. If you want to prepare a concrete slab, the dimensions and the supports must be examined with the intended use and the neighbouring structures. If the premises remain occupied, the passages and uses to be maintained must be specified.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Do you live in Gy?
Tell us about the project as you see it. We come to measure and look at the actual condition before answering you. The quote remains no-obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare a concrete slab, your quote request should specify the uses that must remain possible during the work. Attach the known dimensions and the plans to define the structures, the junctions and the relevant studies. With this information, MS Contractor SA can specify the scope to be priced.
Preparing your masonry work
The need may involve something new, a repair or an area to be examined.
- Describe the wall, slab or structure concerned with its approximate dimensions.
- Add wide views and close-up photos of the cracks or worn parts.
- Send the available plans and specify the intended use after the work.
We examine the existing structure and its junctions to define what can be priced.
Load-bearing elements may require the opinion of a structural engineer.
Present my projectExamining the structures before masonry work
An opening onto the garden or between two rooms must be studied with the wall and the services. In Gy, attach the plans and the dimensions you want. The structural studies and the temporary measures are defined by the appropriate professionals before the work.
In a brick or concrete wall, we saw rather than break. The edges are clean and the vibrations limited. The reveals are then reworked to receive the new joinery.
Respecting the old stone
Old walls are bound with lime. They absorb moisture and release it into the air. A cement render or a joint that is too hard traps water in the stone and pushes the stains higher. For repointing and rendering these walls, we stay with lime mortars.
When part of a wall has come loose, we take it down and rebuild it with the original stones as far as possible.
A living room added to the villa
In Gy, an extension for a living room or a study is prepared with the structure and the ground. Foundations, walls and openings are defined according to the project. The junction between the old and the new requires a suitable study of the movements and the supports.
For the walls, the choice depends on the planned insulation. Clay brick, concrete block or cast concrete with external insulation.
Low walls, steps and small structures
A deformed low wall calls for an examination of its role, its supports and the drainage of water. The materials that can be reused must be identified. The repair or rebuilding and any drainage measures are then defined according to the structure.
At the visit, we look at the type of walls, the cracks and their direction, the damp and the access for materials. Describe your project and we will arrange a visit on site.
What we can take care of
Every home is different. The quote only includes the useful items once the actual condition has been seen.
- Thresholds, screeds and substrates
- Making good linked to the other trades
- Building or repairing walls
- Openings subject to structural approval
Frequently asked questions about masonry in Gy
Yes. We redo the joints and the damaged parts with a mortar compatible with the stone.
The time needed to prepare the quote is confirmed after the visit, depending on the measurements, the choice of supplies and the trades involved.
Yes. A threshold, a step or an opening to fill in, we take care of it.
Yes, with an engineer’s calculation and a suitable beam. We install props before opening.
How we work in Gy
We set out the walls with a string line and build the courses level, with regular joints. The ring beams, lintels and sills are cast according to the engineer’s drawings.
To open a load-bearing wall, we prop, fit the beam, and only then remove the masonry.
Planning a project in Gy? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
