MS Contractor SA

Locality in the canton of Geneva · House, villa and apartment

Building permit, APA and application file in Puplinge

Before your work, gather the plans and describe the changes you have in mind. If you want to prepare an interior conversion, the structures concerned and the building’s rules must be examined with the changes you have in mind. Scheduling constraints should be stated without presuming the duration of the work.

Our projects
Commercial premises under renovation with an exposed technical ceiling and white walls

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Is your home in Puplinge?

Explain your project or work to us in a few lines. A site visit serves as the basis for the quote. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To prepare an interior conversion, your quote request should specify the key dates and the periods when access is possible. Present the planned changes with the plans and any discussions already under way before the work is scheduled. This information helps specify the items in your quote.

Gathering the documents for your transformation

The procedure to consider depends on the building and the exact nature of the project.

  • Describe the changes you want, distinguishing the interior, the openings and the surroundings.
  • Send the existing plans and the building documents you have.
  • Mention any discussions already under way with the property management agency, the co-owners or the authorities.

We review the project and the missing information to identify the checks to carry out.

The procedures and decisions required remain to be confirmed with the competent bodies.

Present my project

Describing the changes before the permit procedures

An extension, a raised storey, a new opening in the façade, a change of windows that alters the appearance, a swimming pool, a covered shelter, panels on the roof or an outdoor heat pump. All these projects generally require an application to the relevant cantonal office.

Redoing a kitchen or a bathroom inside, without touching the load-bearing walls or the façades, does not usually require one. We check each case before answering you, because a detail can change everything.

The local context matters

In a village core like that of Puplinge, the appearance of roofs, façades and joinery is looked at closely. A render colour, the shape of a dormer or the type of shutters may attract comments. On the edge of an agricultural zone, the possibilities for building are even more limited.

We never promise that a project will be approved. We prepare it to give it every chance, taking into account what exists around it.

The documents to gather in Puplinge

The application includes a cadastral plan, the plans of each floor, a section and the elevations in the current and planned states. Depending on the project, we add photos, a description of the materials, energy calculations or the neighbours' agreement. For a villa in co-ownership (PPE), the co-owners' meeting often has to approve before the application is even submitted.

If the application requires an architect’s signature or an engineer’s calculations, we call on our team’s regular partners. The application is consistent with what our team will then carry out on site.

If work was done in the past without a permit, it is wiser to know before submitting. The situation can then be regularised in the same application.

Counting the weeks before breaking ground

The processing time varies with the procedure and the complexity. It is wiser to submit the application well before the date you want the work to start. In the meantime, the project can be refined and the items with long lead times ordered. Tell us what you have in mind and we will tell you which formalities will need to be planned.

What the works include

Every home is different. The quote only includes the useful items once the actual condition has been seen.

  • Preparing the useful technical information
  • Coordination before the works start
  • Identifying the approvals to obtain
  • Checking the scope subject to a permit

We also work for businesses in Puplinge. Shop, pharmacy or office, the works are organised around opening hours.

Frequently asked questions about building permits in Puplinge

We gather the plans and technical documents with the architect or engineer when one is needed.

The time needed to prepare the quote is confirmed after the visit, depending on the measurements, the choice of supplies and the trades involved.

The stages and timeframes depend on the application. The work schedule is prepared with the formalities and conditions required before starting.

Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.

How we work in Puplinge

Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.

The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.

Planning a project in Puplinge? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Arrange a visit in Puplinge

We get back to you to agree on a visit date that suits you. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française