Locality in the canton of Geneva · House, villa and apartment
Interior demolition and dismantling in Avully
Present your removal and demolition project in Avully, distinguishing the priorities and the elements to keep. If you want to remove an old covering, the removal is prepared with the substrate and the finish planned afterwards. A sketch with the known dimensions makes it possible to discuss the expected result more concretely.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Do you live in Avully?
Tell us about the project as you see it. We come to measure and look at the actual condition before answering you. The quote remains no-obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To remove an old covering, your quote request should specify the measurements taken and those that remain to be confirmed on site. Distinguish the elements to remove from those to protect, with the plans and the surveys available. With this information, MS Contractor SA can specify the scope to be priced.
Defining what needs to be dismantled
Overall photos make it possible to distinguish the elements to remove from those to protect.
- Identify the partitions, equipment or coverings to remove.
- State the elements you want to salvage or keep in place.
- Show the access routes, stairs and spaces available for taking out the materials.
The visit makes it possible to examine the substrates, the neighbouring installations and the protection to plan.
Work on the structure or on suspect materials requires an appropriate assessment before work begins.
Present my projectIdentifying the elements to remove and to preserve
In houses built before the 1990s, some adhesives, floor tiles, fibre cement sheets or pipe lagging may contain amiante. A survey is required before the work. If materials are affected, an authorised company removes them before our team starts.
We also locate the pipes still in use, the live cables and the walls that carry a floor. A light partition between two bedrooms is not treated like a load-bearing cross wall.
In homes in Avully, we also come across old floors packed with infill or straw. This material is heavy and quickly fills a skip, which we anticipate from the visit.
Protecting what stays in place
A parquet floor you want to keep, a wooden staircase, recent windows. All this is covered before the start. Doorways are closed off with sheeting, and we create a protected route to the exit for the rubble.
Before removal work in Avully, the access must be surveyed to choose the means of removal. A skip requires a suitable location and any necessary agreements. In an apartment building, the passages, the protection and the working hours are prepared with the rules provided by the property manager or the co-ownership.
Sorting and removing the rubble
The canton requires construction waste to be sorted. Wood, metal, mineral rubble, plaster and mixed waste go to separate streams. We organise the skips and the collections so that the site stays clear.
For an annex or an outdoor shelter, the dismantling is done piece by piece. Metal sheets, roof structure, slab. Elements in good condition can sometimes be reused elsewhere on the plot.
Dismantling planned with what comes next in mind
Demolishing only what is necessary avoids rebuilding sound parts. We look at the plan of the future room with you before deciding what comes down. If you are preparing a renovation in the municipality, tell us which room you want to start with.
What the works include
This list gives an idea of the work. The exact content depends on what we find on site.
- Sorting and removing materials
- Preparing the substrates for what comes next
- Protecting the areas being kept
- Removing the elements planned in the project
Frequently asked questions about demolition and dismantling in Avully
We sort it and remove it to the planned channels. The home is left clean.
Yes. A small job is prepared like a big one. We come and see before giving you an answer.
The function of the wall and the services it contains must be identified before removal. Structural work requires the appropriate checks and studies.
In Geneva, an amiante survey before work must be carried out for buildings or parts of buildings built before 1991. The materials concerned are identified before any removal or demolition is started.
How we work in Avully
Our partners shut off and secure the water, electricity and gas, then we protect what must stay in place. Dismantling goes from top to bottom, ceilings, partitions, then floors.
A load-bearing wall is only opened after propping, following the engineer’s instructions. Materials are sorted by type before removal.
Planning a project in Avully? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
