Hamlet in Satigny · House, villa and apartment
Interior demolition and dismantling in Bourdigny-Dessous
For your removal and demolition project in Bourdigny-Dessous, start from the elements to change and those you want to keep. If you want to organise dismantling before a renovation, the sequence of work must preserve the structures being kept and prepare the following work. The useful steps depend on the scope and the junctions between the different jobs.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Let’s talk about your home in Bourdigny-Dessous
Tell us about the project as you see it. We come to measure and look at the actual condition before answering you. You receive a written quote, with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To organise dismantling before a renovation, your quote request should specify the other work your project depends on and the limits of each job. Distinguish the elements to remove from those to protect using the available plans and surveys. This information helps specify the items in your quote.
Defining what needs to be dismantled
Overall photos make it possible to distinguish the elements to remove from those to protect.
- Identify the partitions, equipment or coverings to remove.
- State the elements you want to salvage or keep in place.
- Show the access routes, stairs and spaces available for taking out the materials.
The visit makes it possible to examine the substrates, the neighbouring installations and the protection to plan.
Work on the structure or on suspect materials requires an appropriate assessment before work begins.
Present my projectIdentifying the elements to remove and to preserve
In a rural building, some lightweight partitions actually support a beam or weakened joists. We probe, open a small inspection hole and look at the direction of the joists. If a wall is load-bearing, an engineer is consulted and the structure is propped before any removal.
Old floors are checked carefully. A joist attacked by insects or moisture can give way under the weight of accumulated rubble. The rubble is therefore removed as the work progresses instead of letting debris pile up upstairs.
Amiante, lead and old materials
Houses converted between the 1950s and the 1980s sometimes contain amiante. Tile adhesive, fibre cement sheets on annex roofs, ducts, vinyl floor tiles. A survey is carried out before the work and the materials concerned are removed by an authorised company, following the required procedure.
Old lead paints on woodwork and shutters also require precautions. Dry sanding is avoided. Chemical stripping or simply replacing the piece is often healthier for those who work and those who live there.
Removing waste from a farming hamlet
Rubble leaves in sorted skips. Wood, metal, inert waste, plaster, special waste. In a hamlet with narrow lanes, the skip size is chosen according to the access, and parking on the paths used by the winegrowers is avoided. Sometimes several small trips are made rather than using one large container.
Old beams, dressed stones, flat tiles or terracotta tiles can be reused. They are set aside if you want to reuse them in the project.
Protecting what stays in place
Stone staircase, fireplace, original floor, windows being kept. Everything that stays is covered or boxed in. Dust is contained with films and suitable extraction, especially if part of the house remains occupied during the work in Bourdigny-Dessous. Show us the rooms concerned and we will tell you how we would proceed.
What the work in Bourdigny-Dessous can include
Here is what the works can cover. We sort it out together during the visit.
- Sorting and removing materials
Frequently asked questions about demolition and dismantling in Bourdigny-Dessous
We sort it and remove it to the planned channels. The home is left clean.
It is better to check first whether it is load-bearing or whether ducts run through it. We check this on site.
MS Contractor SA coordinates the work defined for your project with an identified contact person. The division of the work is specified with the trades concerned.
In Geneva, an amiante survey before work must be carried out for buildings or parts of buildings built before 1991. The materials concerned are identified before any removal or demolition is started.
How we work in Bourdigny-Dessous
Our partners shut off and secure the water, electricity and gas, then we protect what must stay in place. Dismantling goes from top to bottom, ceilings, partitions, then floors.
A load-bearing wall is only opened after propping, following the engineer’s instructions. Materials are sorted by type before removal.
Planning a project in Bourdigny-Dessous? MS Contractor SA, a general building contractor in Geneva, works in houses, villas and apartments, with a no-obligation quote.
