Locality in the canton of Geneva · House, villa and apartment
Plumbing and bathroom installations in Chancy with our partners
For your plumbing project in Chancy, start from the elements to change and those you want to keep. If you want to reorganise a shower room, the layout of the fixtures must be examined with the supply and waste pipes. Any points still unknown must be identified before a final scope is chosen.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Building work in Chancy?
A word about the home and what you want to change is enough to get started. The rest is seen on site. The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To reorganise a shower room, your quote request should specify the confirmed information and the questions to check during the visit. Indicate the fixtures to be moved and the coverings to be kept to prepare the connections. This information helps specify the items in your quote.
Defining your plumbing project
The expected uses make it possible to prepare the layout before choosing the fixtures.
- State the fixtures to replace, move or add.
- Photograph the whole room, then the visible supply and waste pipes.
- Explain how you would like to use the room and attach a dimensioned plan if you have one.
The visit makes it possible to check the possible layouts and the accessible connections.
Moving a fixture depends in particular on the networks and the configuration of the space.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Bathroom fit-out with a vanity unit, vertically lit mirror, wall-hung toilet and beige tiles.

Toilet area with a wall-hung toilet, flush plate and a junction between a light wall and brown tiling.

View of an existing bathroom with a bath, a washbasin, white wall tiles and blue floor tiles.

View of an existing bathroom with bathtub, bidet, basin and tiled surfaces in beige tones.
Examining the plumbing installations and connections
If your installation includes galvanised steel pipes, a drop in flow or discoloured water deserves a check. Corrosion and deposits may be among the causes to examine. If replacement is needed, the material of the new pipes must be compatible with the installation and the conditions of use. No material removes the need to plan for its upkeep.
Cast-iron or fibre-cement waste pipes are checked. Those containing amiante are removed by an authorised company before our work.
In an old house in Chancy, we sometimes find pipes running through poorly protected outside walls. They may turn to ice in very cold weather. We take the opportunity to reroute them inside or insulate them properly.
A walk-in shower, possible or not
A shower with no step needs a waste outlet lower than the finished floor. On a concrete slab, it is sometimes necessary to core drill or raise the rest of the room. On a timber floor in an old house, we create a box between the joists, checking their condition.
The waterproofing is laid under the tiles, with tapes in the corners and around the penetrations. It is this layer that protects the floor, not the grout joints.
Hard water and water heater
The water in the region is fairly hard. Limescale builds up in the water heater, the taps and the shower heads. A water softener can be discussed according to your use. When the heating system is changed, our partners can replace the electric water heater by a cylinder linked to the heat pump or by a heat pump water heater.
For an upstairs bathroom, our partner plumber checks that the flow remains sufficient when two taps are running at the same time.
A short, well-sequenced project
The plumber, electrician, tiler and painter follow one another in a small room. We coordinate them so that the sequence runs without idle time. A complete bathroom generally takes two to three weeks. Send us the plan or the dimensions of the room and your layout ideas.
What the works include
This list gives an idea of the work. The exact content depends on what we find on site.
- Showers, baths, washbasins and WCs by our partners
- Supply and drainage by our partners
- Taps and sanitary equipment by our partners
- Tests by our partners before the casings are closed
Frequently asked questions about plumbing installations in Chancy
Often yes. The gradient of the drain needs checking. We check it during the visit.
Yes. A small job is prepared like a big one. We come and see before giving you an answer.
Yes, when they are old, our partner plumber replaces them. It is the right time, since the walls are open.
For a complete renovation, allow a few weeks. A toilet can be kept in service if the home has only one.
How we work in Chancy
The existing risers and drains determine where the fittings can go. Our partner plumber lays the supplies and the waste pipes with the right slope, then pressure-tests them before closing the walls.
The waterproofing of the shower areas is done before tiling. Our partners install the fittings and taps last, then adjust them.
Planning a project in Chancy? MS Contractor SA, a general building contractor in Geneva, works in houses, villas and apartments, with a no-obligation quote.