Hamlet in Anières · House, villa and apartment
Thermal insulation company in Chevrens, attics, walls and facades
Present your thermal insulation work in Chevrens with the available plans and the result you want. If you want to consider insulating the walls, the solution is prepared with the substrates, the junctions and the finishes you want. Distinguish the elements to keep from those that need to be redone.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Let’s talk about your home in Chevrens
A word about the home and what you want to change is enough to get started. The rest is seen on site. The quote still comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To consider insulating the walls, your quote request should specify the limits between the parts being kept and the new work. Indicate the walls concerned and the work planned around them to prepare the junctions and finishes. The quote can then distinguish the work to go ahead with from the options to discuss.
Explaining your insulation needs
The discomfort you feel helps target the parts of the building to examine.
- Describe the cold rooms, the walls concerned and the work already done.
- Attach the plans, photos and energy documents you have.
- Say whether you want to work from the inside, from the outside or compare the options.
The visit covers the walls, junctions, visible damp and usage constraints.
The expected performance and the solution chosen depend on the make-up of the building.
Present my projectExamining the walls and junctions to insulate
The roof and the attic floor must be examined with the other walls to prepare your insulation. A thick layer of mineral wool or wood fibre laid between and over the joists clearly changes the comfort of the rooms below.
If the attic is converted, insulation is installed under the rafters or over the roof structure during re-roofing. The vapour barrier must be continuous and carefully connected to the walls.
Stone walls have their own requirements
An old rubble stone wall must be able to dry out. Gluing an impermeable insulation against its inner face traps moisture and causes mould. Capillary-active materials such as wood fibre, hemp boards or lime insulating plasters are preferred. They limit heat loss without trapping water.
External insulation is rarely an option on a farmhouse in the hamlet, because it changes the appearance of the facades and the stone surrounds.
Floors, cellars and weak points
A ground floor above an unheated cellar benefits from being insulated from below, on the cellar ceiling. On a ground-bearing slab, insulation is done with a new slab during a major renovation. Visible thermal bridges are also treated, such as window reveals or concrete lintels added later.
The villas from the sixties to the eighties around Chevrens follow a different logic. There, external wall insulation often becomes the right option.
Thinking about air and grants
Insulating also closes the air leaks that used to ventilate the house in spite of itself. The air must be renewed with suitable ventilation to avoid condensation. For cantonal or federal financial support, certain requirements must be met before the work starts. We tell you which ones.
Tell us how the house behaves in winter, the cold rooms, the damp walls. We will look for the priorities with you.
What we can take care of
This list gives an idea of the work. The exact content depends on what we find on site.
- Insulating walls, ceilings or the roof
- Treating junctions and sensitive points
Frequently asked questions about thermal insulation in Chevrens
The two solutions are compared according to the walls, the junctions and the space available. The appearance of the façade and the moisture conditions must be taken into account.
The time needed to prepare the quote depends on the checks required and the trades involved. It becomes clearer with the information gathered during the visit and any details still to be provided.
Yes, for certain work. The Buildings Programme is one of them. We tell you which documents to provide.
The priorities depend on the losses and the condition of the walls. Roof, walls, openings and floors must be compared before the order of work is chosen.
How we work in Chevrens
We first look at where the home loses heat, between the roof, the walls, the floors and the windows. The insulation is then chosen for each surface.
It is laid without gaps, with a vapour barrier on the heated side and airtight joints. The junctions between surfaces receive particular attention.
Planning a project in Chevrens? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
