MS Contractor SA

Hamlet in Anières · House, villa and apartment

Underpinning in Chevrens

For your underpinning work in Chevrens, start from the elements to change and those you want to keep. If you want to have cracks in a structure examined, the location and development of the cracks must be described without drawing conclusions about their cause from a photo. Any points still unknown should be identified before a final scope is chosen.

Our projects
Structural work, reinforcement of a concrete slab before pouring

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Do you live in Chevrens?

Send us a description and two or three photos. The quote is made after seeing the site. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To have cracks in a structure examined, your quote request should specify the confirmed information and the questions to be checked during the visit. Present the available plans and studies to prepare the phasing with the structural specialists. The quote can then distinguish the work to go ahead with from the options to discuss.

Documenting the signs observed before underpinning

A precise description helps prepare the review, without drawing conclusions remotely about their cause.

  • Locate the cracks, movement or subsidence and say when you noticed them.
  • Provide dated photos and any technical reports already available.
  • Describe previous work and the access conditions to the areas affected.

The visit is used to record the visible signs and organise the useful investigations.

The choice of underpinning method depends on an appropriate study of the building and the ground.

Present my project

Preparing the study of the supports and structure

Old farmhouses often rest on a simple widening of the stone wall, at a shallow depth. For a long time that was enough. Then come a very dry summer that shrinks the clay, a tree that has grown near the facade, a pipe leaking under the kitchen. The ground loses bearing capacity and part of the house sinks.

The causes of movement must be examined according to the ground, the foundations and the known work. The age of a villa does not make it possible to attribute the movement to backfill or to neighbouring work.

Measuring before deciding

The first step is nothing spectacular. Each crack is recorded, plaster tell-tales or gauges are placed and observed for a few weeks. A geotechnical engineer carries out soundings to understand the soil. The civil engineer then proposes the strengthening method.

Without this preliminary work, there is a risk of strengthening the wrong side of the house or treating a crack that has nothing to do with the foundations.

Alternating sections, micropiles or injections

Underpinning a foundation can involve concreting in stages, micropiles or other techniques suited to the ground. The choice is based on the study of the loads, the supports and the soil layers. Any injections also require their relevance to be checked. The support and monitoring are prepared with this study.

The same methods are used to deepen a cellar to gain height. In a farmhouse in Chevrens, this remains feasible if the soil and the presence of water allow it.

Closing up the cracks in the house

Once the foundations have been underpinned, the building is left to stabilise. The tell-tales stay in place and it is checked that they no longer move. Only then are the major cracks stitched, the plaster redone and the affected rooms refreshed.

If a crack concerns you, photograph it with a tape measure placed beside it and send us the image. We will be able to judge the urgency before coming on site.

What we can take care of

This list gives an idea of the work. The exact content depends on what we find on site.

  • Propping and preliminary securing
  • Strengthening existing structures

Do you have commercial premises in Chevrens? We also work for shops, practices and offices.

Frequently asked questions about underpinning in Chevrens

The method depends on the assessment of the building and the ground as well as the structural study. Underpinning in sections may be considered according to the measures defined for the project.

The time needed to prepare the quote depends on the checks required and the trades involved. It becomes clearer with the information gathered during the visit and any details still to be provided.

This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.

Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.

How we work in Chevrens

Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.

Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.

Planning a project in Chevrens? MS Contractor SA, a building and renovation company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Preparing your project in Chevrens

One call or message and we set a date for the visit. The length of the visit depends on the home and the work to be examined. The quote remains no-obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française