Hamlet in Satigny · House, villa and apartment
Kitchen renovation and fitting in Choully
Present your kitchen fitting project in Choully with the available plans and the result you want. If you want to reorganise your kitchen, the circulation and storage are designed with the doors, windows and appliances being kept. Distinguish the elements to keep from those that need to be redone.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
A project in Choully?
A word about the home and what you want to change is enough to get started. The rest is seen on site. The quote still comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To reorganise your kitchen, your quote request should specify the limits between the parts being kept and the new work. Indicate the appliances and storage to be kept to prepare the kitchen connections. This information helps specify the items in your quote.
Gathering your ideas for the kitchen
Organising how the kitchen is used helps compare the possible layouts.
- Attach a plan of the kitchen with the doors, windows and known dimensions.
- List the appliances to keep and those you want to install.
- Describe your storage, preparation and circulation needs with a few photos of the room.
We take the measurements and examine the connections before specifying the layout.
A layout drawn remotely must be confirmed by measurements on site.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Open kitchen fitted with a light central island, built-in hob and wooden floor in the living area.

Kitchen layout with a central island, light fronts, matching worktop and wooden floor nearby.

Overall view of a living area combining an open kitchen with an island and a wooden plank floor.

Linear kitchen with white units, tiled floor in the kitchen area and parquet in the adjoining living space.
Preparing the layout and connections of the kitchen
A pleasant kitchen is judged first by the distance between the sink, the hob and the fridge. We look at how you cook, for how many people, and whether you want an island or a table. Storage is then placed according to what is used every day and what comes out once a year.
For a family that entertains often, a large worktop and a well-placed dishwasher count for more than an extra appliance.
Opening a wall in an old house
Connecting the kitchen to the living room often requires an opening in a load-bearing wall. In a farmhouse in the hamlet, this wall may be thick stone. An engineer defines the beam or the steel frame, and the mason makes the opening with propping. The floors are reviewed at the same time to obtain a continuous surface.
In a villa, the walls are thinner but the load-bearing question remains the same. A partition is never removed without having been checked.
Water, electricity and ventilation
Moving the sink means finding a slope for the waste pipe again. A central island with a hob requires a floor-level power supply and a suitable cooker hood. In a well-insulated house, a recirculating hood avoids drilling through the facade and does not cause heat loss.
The services are installed before plastering and painting. The kitchen fitter comes in once the walls are finished, for a clean installation.
Materials that last
Worktops in natural stone, ceramic or composite, lacquered fronts, solid wood or veneer. Each has its own maintenance requirements. For a rural-style house in Choully, a stone worktop and light wood fronts go well with the beams and thick walls.
We coordinate the demolition, the services, the finishes and the assembly of the kitchen. Send us a rough plan of the room and your wishes, even approximate ones.
What we can take care of
Every home is different. The quote only includes the useful items once the actual condition has been seen.
- Worktops and splashbacks
Shops and practices in Choully can also entrust us with this type of work. We adapt to their activity.
Frequently asked questions about kitchen fitting in Choully
We do. Our partner companies make the connections, which are part of the works, along with installing the units.
Generally two to three weeks. A temporary kitchen corner can be set up if needed.
Often yes. We check the drainage and the gradient before approving the plan.
We look at the rooms concerned, take measurements and listen to what you want. The quote then follows in writing.
How we work in Choully
We measure the room precisely and note the water supplies, the drains, the sockets and the ventilation. The services are adapted to the new layout before the units arrive.
The units are then set level and fixed to the wall. The worktop is measured on the fitted units, and the appliances are connected by our partners and tested with you.
Planning a project in Choully? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
