Locality in the canton of Geneva · House, villa and apartment
Earthworks company in Collonge-Bellerive, excavations and trenches
The scope of your earthworks project in Collonge-Bellerive is defined with your needs and the existing structures. If you want to organise excavation and backfill, the volumes to move and the traffic routes are part of preparing the site. The structures and equipment you want to keep must be identified to delimit the repairs.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
A project in Collonge-Bellerive?
Describe the home and what you expect from the work. We come and see before drafting the quote. The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To organise excavation and backfill, your quote request should specify the finishes to keep and those you want to harmonise. Attach the plan and the known information on the services to prepare the excavations and the access. With this information, MS Contractor SA can specify the scope to be priced.
Describing the ground before earthworks
Access and the future use of the land help prepare a first estimate.
- Explain what you want to create and give the approximate dimensions of the area.
- Photograph the slope, the route from the street and the neighbouring buildings.
- Point out known utility networks and any available drainage plans.
On site, the review covers in particular the levels, access and options for removing materials.
The nature of the subsoil and buried networks may require further checks.
Present my projectExamining the ground and access before the work
The excavation and bearing conditions must be defined from the project’s ground. A geotechnical study may be needed depending on the structure and the risks identified. It helps specify the stability measures and water management before the earthworks.
These data decide everything. A simple bank, shoring the excavation, pumping during the work. It is wiser to have them before signing off a schedule.
Water, the first concern on site
An excavation that fills up after a night of rain is a common sight on flat ground near the lake. We plan a pump and a sump. The pumped water does not go just anywhere, it is directed to the right network.
For perimeter drainage, we expose the basement walls down to the foundations. We fit a dimpled membrane against the wall, a drainage pipe at the base and a backfill of clean gravel. This work resolves many cases of damp cellars.
Access, trees and excavated soil
Trees and structures to be preserved must be identified before the site routes are laid out. Protection zones and working methods are prepared with the project’s constraints. Also indicate the access needed for maintenance and deliveries.
The topsoil is set aside to be put back at the end. Spoil that is not used for backfill is taken away by lorry. Sufficient access from the road is therefore needed, which we check during the visit.
Backfilling and compacting
Poorly compacted backfill subsides. The terrace laid on top cracks and the driveway sinks. We backfill in layers and compact each one before moving on to the next.
Tell us what you want to build or drain. We will come and see the plot in Collonge-Bellerive and tell you which studies to plan.
The work possible in Collonge-Bellerive
Depending on the age of the building and its condition, some items drop out and others are added.
- Routes for underground services
- Backfilling and preparing the surroundings
- Excavations and levelling
- Preparing foundations and exterior structures
Frequently asked questions about earthworks in Collonge-Bellerive
Some of it can stay on the plot. The rest goes to landfill according to its quality.
The time needed to prepare the quote depends on the checks and the trades concerned. It is clarified with the information gathered during the visit.
Yes. Temporary retaining work is sometimes needed. We see this during the visit.
Yes. We locate the buried pipes and cables before starting the excavator.
How we work in Collonge-Bellerive
We ask for the plans of the underground services before setting out the excavation. The topsoil is set aside, then we dig in layers down to firm ground.
The slopes are cut to a stable angle and the bottom of the excavation is levelled. The soil is removed or kept for backfilling.
Planning a project in Collonge-Bellerive? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
