MS Contractor SA

Hamlet in Meinier · House, villa and apartment

Underpinning in Corsinge

Present your underpinning work in Corsinge, distinguishing the priorities from the elements to keep. If you want to prepare a change to the supports, the solution depends on the structural studies and the structures concerned. Known previous work can help understand the structures and the limits of the repair.

Our projects
Structural work, reinforcement of a concrete slab before pouring

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

A project in Corsinge?

State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. The quote still comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To prepare a change to the supports, your quote request should specify any known previous work and the documents you have. Present the available plans and studies to prepare the phasing with the structural specialists. This information helps specify the items in your quote.

Documenting the signs observed before underpinning

A precise description helps prepare the review, without drawing conclusions remotely about their cause.

  • Locate the cracks, movement or subsidence and say when you noticed them.
  • Provide dated photos and any technical reports already available.
  • Describe previous work and the access conditions to the areas affected.

The visit is used to record the visible signs and organise the useful investigations.

The choice of underpinning method depends on an appropriate study of the building and the ground.

Present my project

Preparing the study of the supports and structure

Diagonal cracks above doors, a window that rubs from one season to the next, tiles that crack in a straight line. These signs do not always mean that the foundations are giving way, but they deserve analysis. Tell-tales are sometimes placed on the cracks to see whether they are still moving over several months.

The civil engineer then makes an assessment and proposes a method. We carry out the work according to the plans of the engineer and stay in contact throughout the work.

Working in alternating sections

Underpinning a foundation requires a method and phasing designed for the building. The stages, the temporary supports and the time needed are defined by the study. Monitoring must make it possible to check the behaviour of the structure during the work.

For heavier cases, drilled micropiles go down to reach firm ground further below. Installing them requires a compact machine that passes through an ordinary barn door.

Gaining height in a vaulted cellar

In farmhouses, cellars are often low. Gaining a few tens of centimetres means going down below the existing foundations. The same method is used, in stages, with the walls propped and the water carefully managed. Perimeter drainage and waterproofing are installed before closing up.

The vault itself is checked. Empty joints or a stone that is dropping are dealt with before the floor is touched.

Monitoring changes on site

Level measurements taken before, during and after the work show that the wall is no longer moving.

Each building reacts in its own way and we do not propose a solution without having seen the site. If cracks worry you in your house in Corsinge, photograph them with a tape measure placed next to them and contact us. We will come and measure how they develop.

What the works include

Depending on the age of the building and its condition, some items drop out and others are added.

  • Coordination with the structural study

Frequently asked questions about underpinning in Corsinge

Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.

The method depends on the assessment of the building and the ground as well as the structural study. Underpinning in sections may be considered according to the measures defined for the project.

The time needed to prepare the quote depends on the checks required and the trades involved. It becomes clearer with the information gathered during the visit and any details still to be provided.

This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.

How we work in Corsinge

Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.

Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.

Planning a project in Corsinge? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

What next?

One call or message and we set a date for the visit. The length of the visit depends on the home and the work to be examined. Your quote is no-obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française