Hamlet in Presinge · House, villa and apartment
Tiler in La Louvière, tiling and ceramic wall tiling
Describe your tiling installation or renovation project in La Louvière based on your uses and the result you expect. If you want to lay outdoor tiling, the levels, the thresholds and the path of the water need to be examined with the uses of the terrace. A narrow passage or an area that is difficult to reach is worth mentioning from the first exchange.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Is your home in La Louvière?
Send us a description and two or three photos. The quote is made after seeing the site. Your quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To lay outdoor tiling, your quote request should specify the available access and the dimensions of the passages you know. Specify the surfaces and the junctions to be kept so that the preparation of the substrate is included in the quote. This information helps specify the items in your quote.
Preparing your tiling project
The choice of tiles is prepared together with the condition of the substrate and the use of the room.
- State the approximate areas to tile and the existing coverings.
- Photograph the floors, corners, thresholds and areas exposed to water.
- Share the formats or styles you would like and the equipment to keep.
The visit is used to examine flatness, junctions and the preparation needed.
Laying over the existing covering is only decided after its condition has been checked.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

View of the wooden doors and frames in an entrance hall with white walls and a tiled floor.

Bathroom fit-out with a vanity unit, vertically lit mirror, wall-hung toilet and beige tiles.

View of grey tiles and matching skirting in the corner of a room with white walls.

View of the sanitary fixtures and brown tiled walls of a bathroom whose fittings are being installed.
Examining the substrate before tiling work
The substrate must be examined before the tiles are laid. An old surface that has come loose, a crack or a floor that deforms requires the necessary repairs to be defined. The preparation products and the laying system are chosen according to the materials and the available levels.
A new screed must dry before the tiles are laid. If the work is rushed, the tiles may lift a few months later.
Large formats, terracotta or mosaic
Large porcelain stoneware tiles make a room look bigger and limit the joints. They require a perfectly flat floor and double buttering. In an old farmhouse, hexagonal terracotta tiles or a terracotta-look tile extend the spirit of the place. Mosaic remains useful for a sloping shower floor.
The layout is planned before laying. The cutting plan avoids a three-centimetre strip along a highly visible wall.
Wet rooms and waterproofing
In a shower or around a bathtub, tiling is not waterproof. The joints let moisture through. Liquid or sheet waterproofing is laid underneath, with corner tapes and sleeves around the water inlets. The tiler checks it before laying the first tile.
Outside, frost decides
On a terrace, only a frost-resistant tile survives the winter. The slope towards the outside, the drainage under the slab and the right adhesive count as much as the tile. A terrace that retains water eventually cracks at the first hard frost. In La Louvière, tell us which surface you want to tile and in which room.
What we can take care of
This list gives an idea of the work. The exact content depends on what we find on site.
- Floor and wall tiling
- Substrate preparation and flatness
Frequently asked questions about tiling in La Louvière
Grout suited to water and easy to maintain. We discuss it according to the use of the room.
The time needed to prepare the quote depends on the checks required and the trades involved. It becomes clearer with the information gathered during the visit and any details still to be provided.
Yes. They require a very flat substrate. We prepare it before laying.
The adhesion and flatness of the existing tiles must be checked along with the compatibility of the installation system and the available levels. These points guide whether they are kept or removed.
How we work in La Louvière
Before laying, we check that the substrate is flat and dry, and we set out the pattern from the centre line of the room. Large formats are laid with adhesive on both the tile and the floor.
In showers, the waterproofing is applied under the tiles. The flexible joints in the corners and the thresholds are finished last.
Planning a project in La Louvière? MS Contractor SA, a general building contractor in Geneva, works in houses, villas and apartments, with a no-obligation quote.
