Locality in the canton of Geneva · House, villa and apartment
Thermal insulation company in Laconnex, lofts, walls and façades
MS Contractor SA studies your thermal insulation work in Laconnex with the existing structures and installations. If you want to prepare the insulation of the roof, the existing build-up and the junctions must be examined with the work planned under the roof. A localised job and a more extensive repair do not cover the same scope.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Is your home in Laconnex?
State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. Your quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare the insulation of the roof, your quote request should specify the parts affected and the result you expect so that the possible solutions can be examined. Indicate the building elements concerned and the work planned around them to prepare the junctions and the finishes. This information helps specify the items in your quote.
Explaining your insulation needs
The discomfort you feel helps target the parts of the building to examine.
- Describe the cold rooms, the walls concerned and the work already done.
- Attach the plans, photos and energy documents you have.
- Say whether you want to work from the inside, from the outside or compare the options.
The visit covers the walls, junctions, visible damp and usage constraints.
The expected performance and the solution chosen depend on the make-up of the building.
Present my projectExamining the walls and junctions to insulate
The roof almost always comes first. An uninsulated attic lets a large share of the heat escape. Next come the walls, the windows, then the floor above a cold cellar. A thermal camera in cold weather shows the thermal bridges and the poorly protected areas.
An energy assessment of the house, such as the CECB energy report, gives an overall view. It is also used to prepare subsidy applications.
Stone walls and vapour-permeable insulation
On a rubble stone farmhouse, the insulation must let vapour through. We use wood fibre, hemp, mineral wool or insulating lime plasters. Polystyrene glued against an old damp wall traps water and causes mould behind the lining.
Lining the walls on the room side takes a few centimetres from each bedroom. From the outside, the space is kept but the appearance of the façade changes, which is not always allowed in the village centre.
Villas with almost no insulation
The existing insulation must be identified before the work is defined. An external solution can be studied depending on the façade and the substrates. The junctions with the windows, blinds and balconies require suitable details.
The floor above the cellar is insulated from below with panels fixed to the cellar ceiling. It is a small job that you feel underfoot straight away.
Financial support and the order of the stages
The canton supports the insulation of the building envelope through the Buildings Programme (Programme Bâtiments). The application must be submitted before the work begins. We prepare the quotes and technical data sheets required with you.
If you are also changing the heating system, it is wiser to insulate first. The new installation will be smaller. Tell us which rooms are cold in your home, as that is often the most telling starting point.
What we can take care of
This list gives an idea of the work. The exact content depends on what we find on site.
- Insulating walls, ceilings or the roof
- Treating junctions and sensitive points
- Choosing a build-up compatible with the substrate
- Coordination with facings and installations
For business premises in Laconnex, we plan the work to limit closure.
Frequently asked questions about thermal insulation in Laconnex
Often with the roof or the attic, where the most heat escapes. Then the façades and the windows.
External insulation does not reduce the interior floor area, but its junctions must be studied. An internal solution can be considered depending on the façade, space and moisture constraints.
Yes, for certain work. The Buildings Programme is one of them. We tell you which documents to provide.
We look at the rooms concerned, take measurements and listen to what you want. The quote then follows in writing.
How we work in Laconnex
We first look at where the home loses heat, between the roof, the walls, the floors and the windows. The insulation is then chosen for each surface.
It is laid without gaps, with a vapour barrier on the heated side and airtight joints. The junctions between surfaces receive particular attention.
Planning a project in Laconnex? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
