Locality in the canton of Geneva · House, villa and apartment
Thermal insulation company in Lancy, lofts, walls and façades
The scope of your thermal insulation work in Lancy is defined with your needs and the existing elements. If you want to prepare roof insulation, the existing build-up and the junctions should be examined together with the work planned under the roof. The elements and equipment you want to keep should be identified to mark out the repairs.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Building work in Lancy?
Tell us about the project as you see it. We come to measure and look at the actual condition before answering you. We give you a no-obligation quote.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare roof insulation, your quote request should specify the finishes to keep and those you want to harmonise. Indicate the walls concerned and the work planned around them so that the junctions and finishes can be prepared. This information helps specify the items in your quote.
Explaining your insulation needs
The discomfort you feel helps target the parts of the building to examine.
- Describe the cold rooms, the walls concerned and the work already done.
- Attach the plans, photos and energy documents you have.
- Say whether you want to work from the inside, from the outside or compare the options.
The visit covers the walls, junctions, visible damp and usage constraints.
The expected performance and the solution chosen depend on the make-up of the building.
Present my projectExamining the walls and junctions to insulate
The roof is often the first source of heat loss. The façades, old glazing and the floor above the cellar follow closely. A CECB energy report or a thermal camera shows the cold areas precisely. Without this, a wall that is not the real issue sometimes gets insulated.
We also look at thermal bridges. Through concrete balconies, lintels, junctions between slab and façade. In buildings from the 1960s and 1970s, these cold spots cause condensation and mould in the corners.
The loft, often first
Insulating an unconverted attic is simple. We roll out or blow insulation over the floor, after fitting a vapour barrier on the warm side. If the loft is lived in, we insulate between and under the rafters, or on top of them during a roof renewal. The thickness depends on the space available and current requirements.
Walls from the outside or from the inside
External insulation can reduce thermal bridges depending on the system and how the junctions are treated, and it does not reduce the living space. It changes the look of the façade and often requires a permit. Panels are glued and anchored, then a reinforced render is applied. The window sills also have to be extended and the shutters adapted.
From the inside, you lose a few centimetres in each room. It is the solution when the façade cannot change, for example in a co-ownership. We take care with the vapour barrier to prevent moisture from condensing in the wall.
The floor above the cellar
A cold floor on the ground floor often comes from an unheated cellar. We fix insulating panels to the cellar ceiling. It is quick and the floor of the house is not touched. Owners in Lancy often notice the difference in comfort.
For part of this work, the canton grants financial support subject to conditions. Tell us about your house, and we will come to locate the heat losses and suggest a logical order.
The most common items
We will not sell you what you do not need. The visit is there precisely to check this.
- Treating junctions and sensitive points
- Choosing a build-up compatible with the substrate
- Coordination with facings and installations
- Insulating walls, ceilings or the roof
Shops and practices in Lancy can also entrust us with this type of work. We adapt to their activity.
Frequently asked questions about thermal insulation in Lancy
It depends on what is affected. Façade, structure, services or common parts often require a procedure. We check before starting.
Yes, for certain work. The Buildings Programme is one of them. We tell you which documents to provide.
The priorities depend on the building and the walls concerned. The observations and available documents make it possible to prepare the study before the interventions are chosen.
Both solutions require examining the substrates and joints. The constraints of the façade, the interior space and the project guide the choice.
How we work in Lancy
We first look at where the home loses heat, between the roof, the walls, the floors and the windows. The insulation is then chosen for each surface.
It is laid without gaps, with a vapour barrier on the heated side and airtight joints. The junctions between surfaces receive particular attention.
Planning a project in Lancy? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
