Locality in the canton of Geneva · House, villa and apartment
Masonry company in Lancy, walls, openings and slabs
For your masonry work in Lancy, start from the elements to change and those you want to keep.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Let’s talk about your home in Lancy
Send us a description and two or three photos. The quote is made after seeing the site. We give you a no-obligation quote.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
If you want to prepare a concrete slab, the dimensions and the supports must be examined together with the planned use and the neighbouring structures. The useful steps depend on the scope and the junctions between the interventions.
To prepare a concrete slab, your quote request should specify the other work your project depends on and the limits of each intervention.
Attach the known dimensions and the plans to define the elements, the junctions and the useful studies. With this information, MS Contractor SA can specify the scope to be priced.
Preparing your masonry work
The need may involve something new, a repair or an area to be examined.
- Describe the wall, slab or structure concerned with its approximate dimensions.
- Add wide views and close-up photos of the cracks or worn parts.
- Send the available plans and specify the intended use after the work.
We examine the existing structure and its junctions to define what can be priced.
Load-bearing elements may require the opinion of a structural engineer.
Present my projectComparing finished heights
The thickness of the future floor covering and its installation counts as much as that of the substrate. Doors and passageways must be taken into account before the levels are chosen.
Distinguishing screed from structure
A screed prepares the floor according to its design. It does not replace checking the capacity of the floor structure when the project changes the loads or involves heavy equipment.
Planning the time before the floor covering
The conditions needed to lay a floor covering depend on the substrate and the system chosen. Strength and moisture must be checked according to the applicable specifications.
What we do in Lancy
Here is what the works can cover. We sort it out together during the visit.
- Making good linked to the other trades
- Building or repairing walls
- Openings subject to structural approval
- Thresholds, screeds and substrates
Do you have commercial premises in Lancy? We also work for shops, practices and offices.
Frequently asked questions about masonry in Lancy
MS Contractor SA can examine your masonry request and the preparation needed before the floor coverings. Specify the current levels, the rooms concerned and the result you want.
No. On its own, it does not resolve a structural weakness or an unstable substrate. The role of the different layers and the condition of the floor structure must be examined.
The new floor can reduce the clearance under the doors and change the thresholds. These constraints guide the thicknesses and the adjustments to plan.
How we work in Lancy
We set out the walls with a string line and build the courses level, with regular joints. The ring beams, lintels and sills are cast according to the engineer’s drawings.
To open a load-bearing wall, we prop, fit the beam, and only then remove the masonry.
Planning a project in Lancy? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
