MS Contractor SA

Locality in the canton of Geneva · House, villa and apartment

New timber roof structure and renovation in Meyrin

Describe your roof structure work in Meyrin based on your uses and the expected result. If you want to prepare a conversion under the roof, the use of the space and the structural changes must be studied together. Your habits of use help describe the expected result and the points to improve.

Our projects
Roof structure, new rafters and battens before the roof covering

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Is your home in Meyrin?

State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To prepare a conversion under the roof, your quote request should specify the current uses and what you would like to make more practical. Attach the available plans and the observations made from a safe access point so that the structural checks can be prepared. The quote can then distinguish the work to go ahead with from the options to discuss.

Preparing the review of your roof structure

The project takes shape from the existing structure and the intended use of the space under the roof.

  • Explain whether you want to repair, transform or fit out the space.
  • Send the plans and photos taken from a place you can reach safely.
  • Point out any signs of damp and any known reports or previous work.

The review covers the accessible elements, the supports and the links with the roof covering.

The capacity of the structure must be assessed before any change of load or shape.

Present my project

Preparing the examination of the roof structure

If your house has a solid timber roof structure, its joints and the areas exposed to past leaks must be examined. Known repairs or changes are useful to present. The condition of each member concerned must be checked before deciding what can be kept.

More recent villas often have factory-made trussed rafters, light and set very close together. They cannot take having a member cut to gain height. Converting these lofts requires a proper strengthening project, calculated by a timber engineer.

What we check when we go up under the roof

We probe the timbers at the sensitive points. The rafter feet, the bearings on the walls, the areas under the valleys and around the chimney. Timber that sounds hollow or gives under the tip of a screwdriver indicates rot or insects.

Small round holes and fine sawdust give away wood-boring insects. Depending on the extent, we treat on site or replace the affected members. We also check that the roof structure has not sagged under the weight of the tiles.

An extra bedroom under the roof

To create a bedroom or an office under the roof, specify the uses and the access you want. The floor, the height, the lighting and the insulation must be studied together. The openings and any procedures are defined with the structure and the constraints of the building.

We plan the insulation from the design of the strengthening. Placing the insulation between and under the rafters changes the size of the members to be added.

Repairing, strengthening or replacing

Most of the time, we keep the roof structure and strengthen what needs strengthening. We double a rafter, add a purlin, replace a joist hanger. Complete replacement remains rare and is decided when the timbers are too badly affected or the project changes the shape of the roof.

Our carpenters work with the team’s roofers and sheet metal workers. For a villa in Meyrin, this spares chasing three companies for a single roof. Describe your loft project or send a photo of the roof structure.

What the works can include in Meyrin

Not everything is necessarily needed at your home. We only keep what is useful after seeing the premises.

  • Coordination with insulation and roofing
  • Survey of the existing structure
  • Strengthening or replacing elements
  • Adaptation for a new layout

Frequently asked questions about roof structures in Meyrin

It depends on what is affected. Façade, structure, services or common parts often require a procedure. We check before starting.

Yes, when necessary. We treat the affected members and replace those that are no longer sound.

We probe the wood and look for signs of insects and damp. A weak member is strengthened or replaced.

Often yes. The height, the roof structure and the access need to be checked. We look at all this on site.

How we work in Meyrin

The roof frame is cut in the workshop from the survey of the building and the sections given by the engineer. On site, we raise the trusses, then fix the purlins and the rafters.

Each joint and anchor is checked. The roof is covered with an underlay as soon as the frame is up, before the roofer arrives.

Planning a project in Meyrin? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Book an appointment in Meyrin

You can also send us photos before the visit. This helps us come with the right questions. You receive a written quote, with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française