Locality in the canton of Geneva · House, villa and apartment
Earthworks company in Meyrin, excavations and trenches
MS Contractor SA studies your earthworks project in Meyrin together with the elements and installations already in place. If you want to prepare a plot before construction, the footprint must be examined together with the project and the information available on the land. The limits of the finishes are discussed with the neighbouring surfaces, not only with the work area.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Is your home in Meyrin?
State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. The quote still comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare a plot before construction, your quote request should specify the junctions and the limit you want for the finishing repairs. Attach the plan and the known information on the services to prepare the excavations and access. This information helps specify the items in your quote.
Describing the ground before earthworks
Access and the future use of the land help prepare a first estimate.
- Explain what you want to create and give the approximate dimensions of the area.
- Photograph the slope, the route from the street and the neighbouring buildings.
- Point out known utility networks and any available drainage plans.
On site, the review covers in particular the levels, access and options for removing materials.
The nature of the subsoil and buried networks may require further checks.
Present my projectExamining the ground and access before the work
The study of earthworks must examine the stability of the ground and the water conditions. Depending on the structure and the risks identified, geotechnical investigations may be needed. The excavation protection and the supports are defined on the basis of this information.
The presence of water in the ground and its variations must be examined if they can affect the excavation. The working method and the management measures are defined with the observations and the project study. Water coming in does not automatically mean that permanent drainage must be created.
What to look for during the visit
Water, gas, electricity and telecommunication lines often run where they are not expected. We request the network plans and carry out a survey on site. A torn cable can cut the power to a whole stretch of street.
The width of the gate, the load-bearing capacity of the passage and the storage areas influence the choice of equipment. Indicate the trees and structures to protect. A small machine can be considered when access is limited, depending on the passage actually available.
The stages of well-run earthworks
We first strip the topsoil, set aside to be reused in the garden. Then we dig to the planned level, with sloping banks or shoring if the depth requires it. The bottom of the excavation is checked before the blinding concrete.
The backfill materials and how they are placed must suit the planned use of the area. Compaction and the checks are defined according to the project. The quote must specify the work under future slabs, whose stability also depends on the ground and on the design as a whole.
Removing or keeping the soil
Clean soil can sometimes stay on site to shape the garden. The surplus goes to an approved landfill by lorry. If suspect materials are found, such as old fill mixed with waste, they follow a separate channel.
Send us a plan of the plot or a few photos of the land. We will come and see the plot and the access before suggesting a method.
The work possible in Meyrin
Every home is different. The quote only includes the useful items once the actual condition has been seen.
- Excavations and levelling
- Preparing foundations and exterior structures
- Routes for underground services
- Backfilling and preparing the surroundings
Frequently asked questions about earthworks in Meyrin
Some of it can stay on the plot. The rest goes to landfill according to its quality.
The time needed to prepare the quote depends on the checks and the trades concerned. It is clarified with the information gathered during the visit.
Yes. Temporary retaining work is sometimes needed. We see this during the visit.
Yes. We locate the buried pipes and cables before starting the excavator.
How we work in Meyrin
We ask for the plans of the underground services before setting out the excavation. The topsoil is set aside, then we dig in layers down to firm ground.
The slopes are cut to a stable angle and the bottom of the excavation is levelled. The soil is removed or kept for backfilling.
Planning a project in Meyrin? MS Contractor SA, a general building contractor in Geneva, works in houses, villas and apartments, with a no-obligation quote.