Hamlet in Jussy · House, villa and apartment
Plumbing and bathroom installations in Monniaz with our partners
For your plumbing project in Monniaz, start from the elements to change and those you want to keep. If you want to replace a sanitary fixture, the replacement is prepared with the dimensions, the connections and the finishes being kept. Any points still unknown must be identified before a final scope is chosen.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Building work in Monniaz?
Explain your project or work to us in a few lines. A site visit serves as the basis for the quote. Your quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To replace a sanitary fixture, your quote request should specify the confirmed information and the questions to check during the visit. Indicate the fixtures to be moved and the coverings to be kept to prepare the connections. The quote can then distinguish the work to go ahead with from the options to discuss.
Defining your plumbing project
The expected uses make it possible to prepare the layout before choosing the fixtures.
- State the fixtures to replace, move or add.
- Photograph the whole room, then the visible supply and waste pipes.
- Explain how you would like to use the room and attach a dimensioned plan if you have one.
The visit makes it possible to check the possible layouts and the accessible connections.
Moving a fixture depends in particular on the networks and the configuration of the space.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Bathroom fit-out with a vanity unit, vertically lit mirror, wall-hung toilet and beige tiles.

View of an existing bathroom with a bath, a washbasin, white wall tiles and blue floor tiles.

View of an existing bathroom with bathtub, bidet, basin and tiled surfaces in beige tones.

View of the sanitary fixtures and brown tiled walls of a bathroom whose fittings are being installed.
Examining the plumbing installations and connections
Over the years, galvanised steel clogs with limescale and corrodes from the inside. The pressure drops and the water comes out discoloured in the morning. Old cast iron or fibre cement waste pipes crack. Our partners replace these networks with multilayer or stainless steel pipes for water and polyethylene for waste.
A distribution manifold placed in the cellar or a plant room makes it possible to shut off each room separately. In the event of a leak, there is no longer any need to shut off the whole house.
Placing the bathroom in the right spot
In a farmhouse, creating a bathroom upstairs means finding a route for the waste pipe. Old floors are thick but the joists cannot be drilled just anywhere. We look for a vertical duct near a load-bearing wall or along a partition.
Stacking the wet rooms one above the other greatly simplifies the network. An inspection opening stays accessible at the foot of each stack for future checks.
Water heater, limescale and water softener
A heat pump water heater or a cylinder linked to solar collectors suits a family home well. The storage is sized according to the number of occupants and their habits. A large bath quickly empties a small cylinder.
The water from Geneva taps leaves quite a lot of limescale. A water softener protects the taps and appliances, especially if a walk-in shower with glass screens is installed.
Before the tiler, after the mason
The plumbing comes before the tiler and after the mason. Waterproofing under the tiles, a sloping screed for the shower, a support frame for the wall-hung toilet. Everything must be ready in the right order. Our team follows these stages so that nothing has to be redone.
Tell us about the wet rooms you want to create or renovate in Monniaz. We will look together at the existing network and the possible routes.
What we can take care of
Every home is different. The quote only includes the useful items once the actual condition has been seen.
- Showers, baths, washbasins and WCs by our partners
- Tests by our partners before the casings are closed
Shops and practices in Monniaz can also entrust us with this type of work. We adapt to their activity.
Frequently asked questions about plumbing installations in Monniaz
For a complete renovation, allow a few weeks. A toilet can be kept in service if the home has only one.
Often yes. The gradient of the drain needs checking. We check it during the visit.
Yes, when they are old, our partner plumber replaces them. It is the right time, since the walls are open.
Whether you can stay in the home must be studied before the works. It depends on the work, the access and the safety measures planned. Specify your situation in the quote request so that the organisation and any periods of temporary rehousing can be prepared.
How we work in Monniaz
The existing risers and drains determine where the fittings can go. Our partner plumber lays the supplies and the waste pipes with the right slope, then pressure-tests them before closing the walls.
The waterproofing of the shower areas is done before tiling. Our partners install the fittings and taps last, then adjust them.
Planning a project in Monniaz? MS Contractor SA, a building and renovation company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
