Hamlet in Jussy · House, villa and apartment
Underpinning in Monniaz
The scope of your underpinning work in Monniaz is defined with your needs and the existing structures. If you want to organise structural repairs, the phasing and the protection are defined with the specialists and the necessary studies. The necessary work and the options you want to compare are better presented separately.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Let’s talk about your home in Monniaz
A word about the home and what you want to change is enough to get started. The rest is seen on site. Your quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To organise structural repairs, your quote request should set out the priority items and the options to study separately. Present the available plans and studies to prepare the phasing with the structural specialists. This information helps specify the items in your quote.
Documenting the signs observed before underpinning
A precise description helps prepare the review, without drawing conclusions remotely about their cause.
- Locate the cracks, movement or subsidence and say when you noticed them.
- Provide dated photos and any technical reports already available.
- Describe previous work and the access conditions to the areas affected.
The visit is used to record the visible signs and organise the useful investigations.
The choice of underpinning method depends on an appropriate study of the building and the ground.
Present my projectPreparing the study of the supports and structure
A crack running diagonally across the wall, a window that no longer closes, tiles lifting on the ground floor. On their own, these signs prove nothing. Together, and if they are developing, they deserve a check.
The clay soils of the area swell when they are saturated with water and shrink during droughts. A large walnut or oak tree planted a few metres from the façade accentuates this movement by drying out the soil under the foundations.
Gauges, test pits and a note from the engineer
Gauges are fitted across the cracks to monitor how they open over several weeks. A civil engineer then has a few test pits opened at the foot of the walls. They show the depth of the foundations and the nature of the ground. The note from the engineer sets out the method and the phasing.
Monitoring the cracks makes it possible to document how they develop. Its duration and the measurements to be taken are defined according to the building and the study before the repairs are chosen.
Alternating sections and micropiles
The most traditional method remains underpinning in alternating sections. The ground under the wall is dug out over about one metre, deeper concrete is poured, then work moves to a section further away. At no point does the wall lose its bearing over more than a short section. For heavier loads or poor ground, drilled micropiles are used. Each section is checked before the next one is opened, and the engineer visits the site at the decisive stages.
The same methods make it possible to create a cellar under an existing house. In Monniaz, this kind of project depends a great deal on the presence of water in the ground.
Letting the farmhouse settle
The gauges stay in place for a few months. When the measurements are stable, the cracks are filled with a flexible mortar and the renders are redone. Send us dated photos of the cracks in your house in Monniaz. They help a great deal in preparing the visit.
What we can take care of
Depending on the age of the building and its condition, some items drop out and others are added.
- Propping and preliminary securing
- Coordination with the structural study
Do you have commercial premises in Monniaz? We also work for shops, practices and offices.
Frequently asked questions about underpinning in Monniaz
The method depends on the assessment of the building and the ground as well as the structural study. Underpinning in sections may be considered according to the measures defined for the project.
Yes. A small job is prepared like a big one. We come and see before giving you an answer.
This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.
Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.
How we work in Monniaz
Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.
Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.
Planning a project in Monniaz? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.