MS Contractor SA

Hamlet in Chancy · House, villa and apartment

Thermal insulation company in Passeiry, lofts, walls and façades

The available plans and observations help specify your thermal insulation work in Passeiry. If you want to consider insulating the walls, the solution is prepared with the substrates, the junctions and the finishes you want. Other work planned in the same area may change the preparation and the sequence of trades.

Our projects
Thermal insulation, insulating panels fitted across the whole façade

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

A project in Passeiry?

A word about the home and what you want to change is enough to get started. The rest is seen on site. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To consider insulating the walls, your quote request should specify the work planned with the other trades and how it connects. Indicate the building elements concerned and the work planned around them to prepare the junctions and the finishes. The quote can then distinguish the work to go ahead with from the options to discuss.

Explaining your insulation needs

The discomfort you feel helps target the parts of the building to examine.

  • Describe the cold rooms, the walls concerned and the work already done.
  • Attach the plans, photos and energy documents you have.
  • Say whether you want to work from the inside, from the outside or compare the options.

The visit covers the walls, junctions, visible damp and usage constraints.

The expected performance and the solution chosen depend on the make-up of the building.

Present my project

Examining the walls and junctions to insulate

The walls and their junctions must be studied before the work is defined. The roof or the loft floor may be among the options to compare. In an unoccupied loft, a thick layer of wool is rolled out on the floor. For converted attics, the insulation goes between and over the rafters, with a vapour control layer on the warm side.

A renewed roof makes it possible to insulate from the outside. The roof structure remains visible from inside and thermal bridges are reduced.

Old walls, caution with moisture

Gluing impermeable insulation against a stone wall is a common mistake. Moisture that used to migrate unhindered becomes trapped and the wall deteriorates. On these substrates, we prefer vapour-permeable materials. Wood fibre, cork, insulating plasters based on lime and hemp.

Interior insulation slightly reduces the area of the rooms and requires care at the junctions with the floors. External insulation must be compared with the other solutions, along with its junctions and the change in the appearance of the façade, which is not always accepted on an old farmhouse.

Villas, floors and weak spots

When the villa is built of brick or concrete, external wall insulation with a finishing render can be compared with other solutions depending on the building. We also insulate the ceiling of the cellar or garage when the living rooms are above. Blind boxes, door thresholds and roof junctions are treated to avoid draughts.

After insulation, a house becomes more airtight. Ventilation must be considered, otherwise condensation appears on the windows and in the corners.

Cantonal subsidies and an initial assessment

In Geneva, the canton supports certain insulation work with subsidies, which often need to be applied for before the work begins. An energy assessment of the building helps set priorities. We can look at your house in Passeiry room by room and tell you where the heat is escaping.

What the works include

Every home is different. The quote only includes the useful items once the actual condition has been seen.

  • Insulating walls, ceilings or the roof
  • Treating junctions and sensitive points

Do you have commercial premises in Passeiry? We also work for shops, practices and offices.

Frequently asked questions about thermal insulation in Passeiry

The two solutions are compared according to the walls, the junctions and the space available. The appearance of the façade and the moisture conditions must be taken into account.

The time needed to prepare the quote depends on the checks required and the trades involved. It becomes clearer with the information gathered during the visit and any details still to be provided.

Yes, for certain work. The Buildings Programme is one of them. We tell you which documents to provide.

The priorities depend on the losses and the condition of the walls. Roof, walls, openings and floors must be compared before the order of work is chosen.

How we work in Passeiry

We first look at where the home loses heat, between the roof, the walls, the floors and the windows. The insulation is then chosen for each surface.

It is laid without gaps, with a vapour barrier on the heated side and airtight joints. The junctions between surfaces receive particular attention.

Planning a project in Passeiry? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Preparing your project in Passeiry

One call or message and we set a date for the visit. The length of the visit depends on the home and the work to be examined. The quote remains no-obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française