Hamlet in Satigny · House, villa and apartment
Plastering in Peissy, partitions, linings and false ceilings
MS Contractor SA studies your plastering and partition work in Peissy with the existing structures and installations. If you want to box in pipes or a volume, the boxing must be prepared with the access to be kept and the junctions with the walls. The finishing limits are discussed with the neighbouring surfaces, not only with the work area.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Is your home in Peissy?
Describe the home and what you expect from the work. We come and see before drafting the quote. The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To box in pipes or a volume, your quote request should specify the junctions and the limit you want for the finishing repairs. Specify the uses and the junctions with the floors, walls and equipment being kept. This information helps specify the items in your quote.
Specifying your partition and ceiling needs
A room may need a new layout, a repair or surface preparation.
- Draw the partitions to create or move and note the approximate height of the rooms.
- Add photos of the ceilings, cracks and existing junctions.
- Specify the equipment to integrate and the planned use of each space.
We examine the substrates, service routes and the finishes you want.
The function of an existing partition must be checked before it is modified.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Interior fit-out with curved partitions, a porthole opening and decorative paintwork with green and yellow patterns.

Decorative paintwork with green and yellow patterns on the walls of a corridor, around a porthole and light-coloured doors.

View of an interior corridor with porthole doors, interior windows and curved partitions in light tones.
Examining the substrates and plasterwork
An uneven wall is examined before choosing a plaster or a lining. The stability, the moisture and the services to be integrated guide this comparison. The system and the space it takes up in the room are specified with the finish you want.
Where you want to keep the stone visible, we do not line it. We repoint and leave the wall as it is, which gives character to a living room or a converted cellar.
Ceilings that hold on old beams
The joists of old houses sag a little over time. A plasterboard ceiling screwed directly underneath ends up cracking at the joints. We prefer an independent hanging frame that absorbs the small movements.
Sometimes we also decide to remove an old false ceiling to reveal the beams. We then clean the wood and redo the infill between the joists in plaster or lime.
Damp and plaster do not get on
The ground floors of winegrowers’ houses can be damp at the foot of the walls. We deal with the cause before installing a lining, otherwise the boards stain and soften. For bathrooms, we use moisture-resistant boards and additional waterproofing in the shower areas.
Gypsum plasters on stone are reserved for sound, dry walls. Elsewhere, a lime plaster remains safer.
Finishes ready for painting
Well-finished plasterwork shows neither joints nor screws under the raking light from a window. We tape, smooth and sand until we obtain an even surface. If you want to rearrange the rooms in your house in Peissy, even a rough sketch helps us prepare the visit.
What the works include
Depending on the age of the building and its condition, some items drop out and others are added.
- Preparation before painting or covering
Shops and practices in Peissy can also entrust us with this type of work. We adapt to their activity.
Frequently asked questions about plastering and partitions in Peissy
Boards are quicker and dry straight away. Traditional plaster remains useful on old walls.
Yes, with a partition. We check the light, the ventilation and the routes for the ducts.
Yes. We first look for the cause, then redo it with tape and filler.
We look at the rooms concerned, take measurements and listen to what you want. The quote then follows in writing.
How we work in Peissy
Partitions are built on a metal frame filled with insulation, then closed with plasterboard. The joints are finished in three passes with tape, then sanded.
Wet rooms receive moisture-resistant boards. Ceilings include the access hatches and the planned light fittings.
Planning a project in Peissy? MS Contractor SA, a building and renovation company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
