Locality in the canton of Geneva · House, villa and apartment
Tiler in Russin, floor and wall tiling
The available plans and observations help specify your tiling installation or renovation project in Russin. If you want to repair deteriorated tiling, cracked or loose tiles require a look at the substrate before the extent of the repair is decided. Scheduling constraints should be stated without presuming the duration of the work.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
A project in Russin?
Explain your project or work to us in a few lines. A site visit serves as the basis for the quote. We give you a no-obligation quote.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To repair deteriorated tiling, your quote request should specify the key dates and the periods when access is possible. Specify the surfaces and the junctions to be kept so that the substrate preparation is included in the quote. With this information, MS Contractor SA can specify the scope to be priced.
Preparing your tiling project
The choice of tiles is prepared together with the condition of the substrate and the use of the room.
- State the approximate areas to tile and the existing coverings.
- Photograph the floors, corners, thresholds and areas exposed to water.
- Share the formats or styles you would like and the equipment to keep.
The visit is used to examine flatness, junctions and the preparation needed.
Laying over the existing covering is only decided after its condition has been checked.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

View of the wooden doors and frames in an entrance hall with white walls and a tiled floor.

Bathroom fit-out with a vanity unit, vertically lit mirror, wall-hung toilet and beige tiles.

View of a bathroom combining a shower, a wall-hung toilet, brown walls and light wall surfaces.

Kitchen layout with white fronts, a dark splashback, built-in oven and grey floor tiles.
Examining the substrate before tiling work
On a new screed, we wait for it to dry. A moisture measurement confirms this before installation. On old tiling, it is sometimes possible to tile over it if everything adheres well. On a wooden floor, we reinforce it and lay boards and an uncoupling mat that absorbs the small movements of the wood.
On the ground floor of winegrowers' houses, the floor often rests directly on the earth, without insulation. Redoing this floor becomes an opportunity to install insulation and a moisture barrier.
Large formats, cement tiles or terracotta tiles
Large formats make a room look bigger, but they require a very flat floor and adhesive on both the tile and the substrate. Cement tiles and terracotta tiles go well with an old house. Natural stone needs a protective product against stains, especially in a kitchen.
The tile layout is drawn before the first box is opened. We distribute the cuts so that they fall in discreet places and not in the middle of the entrance.
Waterproofing under the shower
Under the tiles of a shower, a liquid or mat waterproofing is laid over the whole base and turned up the walls. The corners receive a special tape. Epoxy joints resist cleaning products and mould better than standard cement joints. A level-access shower also requires a steady fall towards the grate or the channel, set in the screed before the waterproofing.
Terrace tiles and cold winters
A terrace tile must withstand frost without cracking and remain safe under wet feet. A fall of at least one per cent sheds the water. Slabs on pedestals suit terraces over waterproofing, because the water drains away underneath. For a terrace facing the vineyards of Russin, we show you samples on site, in daylight.
What we do in Russin
Here is what the works can cover. We sort it out together during the visit.
- Grout, junctions and finishes
- Floor and wall tiling
- Substrate preparation and flatness
- Waterproofing wet areas
Frequently asked questions about tiling in Russin
Grout suited to water and easy to maintain. We discuss it according to the use of the room.
Yes. They require a very flat substrate. We prepare it before laying.
MS Contractor SA coordinates the work with the teams and partner companies planned for the project. Once the permit is granted, you have a single contact for the work.
Sometimes yes, if the old ones are well bonded and flat. Otherwise we remove them.
How we work in Russin
Before laying, we check that the substrate is flat and dry, and we set out the pattern from the centre line of the room. Large formats are laid with adhesive on both the tile and the floor.
In showers, the waterproofing is applied under the tiles. The flexible joints in the corners and the thresholds are finished last.
Planning a project in Russin? MS Contractor SA, a building and renovation company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
