Hamlet in Troinex · House, villa and apartment
Underpinning in Troinex-Dessus
MS Contractor SA studies your underpinning work in Troinex-Dessus with the existing structures and installations. If you want to convert a space near the foundations, the neighbouring structures and the supports require suitable checks before the work is defined. The structures and objects around the work area must be pointed out to prepare the protection.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Work planned in Troinex-Dessus?
Explain your project or work to us in a few lines. A site visit serves as the basis for the quote. We give you a no-obligation quote.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To convert a space near the foundations, your quote request should specify the neighbouring elements to protect and the access to be maintained around them. Present the available plans and studies to prepare the phasing with the structural specialists. With this information, MS Contractor SA can specify the scope to be priced.
Documenting the signs observed before underpinning
A precise description helps prepare the review, without drawing conclusions remotely about their cause.
- Locate the cracks, movement or subsidence and say when you noticed them.
- Provide dated photos and any technical reports already available.
- Describe previous work and the access conditions to the areas affected.
The visit is used to record the visible signs and organise the useful investigations.
The choice of underpinning method depends on an appropriate study of the building and the ground.
Present my projectPreparing the study of the supports and structure
Clay soils react to cycles of drought and rain. A large tree planted too close to a facade draws water from the soil and accentuates the phenomenon. A leaking pipe can, on the contrary, saturate the ground under one corner of the house. Without knowing the cause, there is a risk of strengthening in the wrong place.
Tell-tales are placed on the cracks and monitored for a few weeks. A civil engineer examines the building and orders soundings if needed.
Three ways to underpin a foundation
The traditional method proceeds in successive passes. A short length is dug under the existing footing, deeper concrete is poured, and then work moves on to the next section in alternation. It is slow but does not require heavy machinery.
Micropiles go down to a more resistant layer and take the loads via ground beams. They are suitable when the sound ground is deep. Their drilling rig is compact and can enter a basement through an ordinary door. Resin or grout injections densify the ground under the foundations in certain specific cases.
Gaining a higher basement
Some villas in Troinex-Dessus have a basement with a low ceiling that the owners would like to convert into a playroom or a study. Lowering the floor means going below the existing foundations. This is underpinning in the strict sense, with waterproofing, drainage and a new slab.
Monitoring during and after
Markers are placed on the walls and measured at each stage. If movement appears, work stops and is adapted. Close neighbours are informed and a record of their buildings can be made before the work starts, as a precaution.
After the underpinning, the cracks are closed once the building has stabilised, not before. If your house in Troinex-Dessus shows signs of movement, send us dated photos of the cracks.
What the work in Troinex-Dessus can include
Here is what the works can cover. We sort it out together during the visit.
- Propping and preliminary securing
- Strengthening existing structures
Frequently asked questions about underpinning in Troinex-Dessus
It depends on what is affected. Façade, structure, services or common parts often require a procedure. We check before starting.
This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.
Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.
The method depends on the assessment of the building and the ground as well as the structural study. Underpinning in sections may be considered according to the measures defined for the project.
How we work in Troinex-Dessus
Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.
Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.
Planning a project in Troinex-Dessus? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
