Earthworks company in Aire-la-Ville, excavations and trenches
MS Contractor SA studies your earthworks project in Aire-la-Ville with the existing structures and installations. If you want to organise the excavation and backfill, the volumes to be moved and the traffic routes are part of preparing the work. The limits of the finishing work are discussed in relation to the neighbouring surfaces, not just the work area.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Do you live in Aire-la-Ville?
Tell us about the project as you see it. We come to measure and look at the actual condition before answering you. The quote remains no-obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To organise the excavation and backfill, your quote request should specify the junctions and where you want the finishing repairs to stop. Attach the plan and the known information on the utility networks to prepare the excavations and the access. With this information, MS Contractor SA can specify the scope to be priced.
Describing the ground before earthworks
Access and the future use of the land help prepare a first estimate.
- Explain what you want to create and give the approximate dimensions of the area.
- Photograph the slope, the route from the street and the neighbouring buildings.
- Point out known utility networks and any available drainage plans.
On site, the review covers in particular the levels, access and options for removing materials.
The nature of the subsoil and buried networks may require further checks.
Present my projectExamining the ground and access before the work
For a small wall or a terrace, a trial pit dug with a mini digger already gives a lot of information. For a basement or a house, we call in a geotechnical engineer, who indicates the nature of the layers, the presence of water and the slope angle the ground can hold without support.
This report is read before opening the excavation. A pocket of wet clay or a glacial boulder is often discovered at the worst moment.
Sloping plots and deep excavations
On a plot that slopes down, we work in steps. The slopes are cut at a safe angle or held by shoring. If the excavation runs alongside a neighbouring house, we monitor its foundations and document their condition before the work, with photos. Near the wooded slopes around Aire-la-Ville, roots and stumps also take time during excavation.
Rainwater runs towards the bottom of the excavation. We plan a low point with a pump and protect the slopes with tarpaulins when a storm threatens.
What to do with the excavated soil
A swimming pool or a basement quickly produces several dozen lorry loads of material. The topsoil is set aside to be put back in the garden. Clean excavated material can be used for backfill on the plot. The surplus goes to an authorised landfill, with the supporting documents required by the canton.
We organise the lorry trips so as not to clog the village at the times when people leave for work. The access roads are cleaned at the end of the day when the wheels have brought back mud.
Drainage and backfill around the walls
Once the buried walls have been built, we apply the waterproofing, a protective mat and a drain at the foot of the foundation. The backfill is placed in compacted layers, with filtering gravel against the wall. It is this detail that keeps a basement dry for years. If you are preparing a project that involves the ground, show us the plot before drawing up the final plans.
What the works include
Depending on the age of the building and its condition, some items drop out and others are added.
- Routes for underground services
- Backfilling and preparing the surroundings
- Excavations and levelling
- Preparing foundations and exterior structures
Frequently asked questions about earthworks in Aire-la-Ville
Some of it can stay on the plot. The rest goes to landfill according to its quality.
The time needed to prepare the quote is confirmed after the visit, depending on the measurements, the choice of supplies and the trades involved.
Yes. Temporary retaining work is sometimes needed. We see this during the visit.
Yes. We locate the buried pipes and cables before starting the excavator.
How we work in Aire-la-Ville
We ask for the plans of the underground services before setting out the excavation. The topsoil is set aside, then we dig in layers down to firm ground.
The slopes are cut to a stable angle and the bottom of the excavation is levelled. The soil is removed or kept for backfilling.
Planning a project in Aire-la-Ville? MS Contractor SA, a general building contractor in Geneva, works in houses, villas and apartments, with a no-obligation quote.