Underpinning in Aire-la-Ville

Present your underpinning work in Aire-la-Ville with the available plans and the result you want. If you want to convert a space near the foundations, the neighbouring structures and the supports require suitable checks before the work is defined. Distinguish the elements to keep from those that need to be redone.

Our projects
Structural work, reinforcement of a concrete slab before pouring

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Do you live in Aire-la-Ville?

Send us a description and two or three photos. The quote is made after seeing the site. The quote still comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To convert a space near the foundations, your quote request should specify the boundaries between the parts being kept and the new work. Present the available plans and studies to prepare the phasing with the structural specialists. With this information, MS Contractor SA can specify the scope to be priced.

Documenting the signs observed before underpinning

A precise description helps prepare the review, without drawing conclusions remotely about their cause.

  • Locate the cracks, movement or subsidence and say when you noticed them.
  • Provide dated photos and any technical reports already available.
  • Describe previous work and the access conditions to the areas affected.

The visit is used to record the visible signs and organise the useful investigations.

The choice of underpinning method depends on an appropriate study of the building and the ground.

Present my project

Preparing the study of the supports and structure

The causes are often linked to water. A leaking pipe under the house, a blocked drain, a large tree planted too close that dries out the soil in summer. On sloping ground, a slight slip can also play a part. Sometimes it is simply a recent extension, founded deeper than the original house, that moves differently. On plots in Aire-la-Ville close to the Rhône embankment, we also look at the overall stability of the ground.

Before talking about work, we install tell-tales on the cracks and monitor them for several weeks. If they widen, a civil engineer takes over the file.

Working in sections, never all at once

The most common technique is to dig under the wall in short alternating lengths. Concrete is poured into each section, left to harden, then the next one is tackled. The wall is never left without support over a long length. Depending on the soil, the engineer may also specify micropiles or injections.

It is slow and delicate work. Deformations are checked at every stage. The readings are recorded and sent to you, which makes it possible to follow the work even from a distance.

Gaining headroom in a cellar

Turning a low cellar into a usable room requires lowering the floor. You cannot dig lower than the wall footings without underpinning them. So the same method is used, section by section, before a new raft is poured. We take the opportunity to deal with the damp with waterproofing and a drain.

The result changes the house. A laundry room, a workshop or a games room find their place where people used to bump their heads.

Protecting the house and the neighbours

If the work concerns a wall close to a neighbouring building, the responsibilities and monitoring measures must be prepared. Prior condition reports and temporary supports are defined according to the project. Dated photographs of the cracks help show how they have developed.

What the works include

Depending on the age of the building and its condition, some items drop out and others are added.

  • Propping and preliminary securing
  • Strengthening existing structures
  • Localised foundation underpinning
  • Coordination with the structural study

Shops and practices in Aire-la-Ville can also entrust us with this type of work. We adapt to their activity.

Frequently asked questions about underpinning in Aire-la-Ville

The underpinning must be defined with the structural and ground study. The temporary arrangements and the stages are designed before the work.

Yes. A small job is prepared like a big one. We come and see before giving you an answer.

This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.

Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.

How we work in Aire-la-Ville

Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.

Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.

Planning a project in Aire-la-Ville? MS Contractor SA, a general building contractor in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Arrange a visit in Aire-la-Ville

A call or a message and we set a date for a visit. The visit is prepared according to the areas to examine and the information available. Your quote is no-obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française