Locality in the canton of Geneva · House, villa and apartment
Underpinning in Avusy
Describe your underpinning work in Avusy based on your uses and the result you expect. If you want to organise structural repairs, the phasing and the protection are defined with the specialists and the necessary studies. The visit is more useful when the questions and documents have already been gathered.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Let’s talk about your home in Avusy
Explain your project or work to us in a few lines. A site visit serves as the basis for the quote. The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To organise structural repairs, your quote request should specify the points to examine and the documents available to limit guesswork. Present the available plans and studies to prepare the phasing with the structural specialists. This information helps specify the items in your quote.
Documenting the signs observed before underpinning
A precise description helps prepare the review, without drawing conclusions remotely about their cause.
- Locate the cracks, movement or subsidence and say when you noticed them.
- Provide dated photos and any technical reports already available.
- Describe previous work and the access conditions to the areas affected.
The visit is used to record the visible signs and organise the useful investigations.
The choice of underpinning method depends on an appropriate study of the building and the ground.
Present my projectPreparing the study of the supports and structure
A stepped crack in a brick wall, a door that has recently started to rub, tiles that split diagonally. These signs show that one part of the house is settling more than another. On the clay soils of the Geneva countryside, dry summers make the soil under the foundations shrink.
A large tree close to the façade can make the phenomenon worse by drawing water from the soil. We note the position of the cracks, their width and how they develop before any decision.
An engineer and a geotechnical engineer from the outset
Nothing is done without a study. The geotechnical engineer analyses the soil at depth. The civil engineer defines the method, the depth of the new foundations and the order of the sections. We then carry out the work according to the engineer’s plans and under the engineer’s supervision.
Plaster tell-tales glued across the cracks before the work make it possible to follow the movements. If they break, the ground is still moving. During and after the underpinning, they confirm that the house has been stabilised.
Working in small sections
Work under a wall must be defined by the structural and soil study. The sequences, the temporary supports and the conditions before each stage are specified before the work. The quote must identify the access and the work associated with the underpinning.
In heavier cases, micropiles drilled down to a stable layer are used. The choice depends on the soil and the weight of the building.
Gaining a cellar under an old house
If you want to create a cellar or a plant room under your house in Avusy, the feasibility must be studied with the structure and the ground. The temporary supports, the removal of soil and the protection against water are defined according to the project.
If you notice cracks widening, tell us quickly. The earlier the observation is made, the simpler the repair remains.
What we can take care of
This list gives an idea of the work. The exact content depends on what we find on site.
- Localised foundation underpinning
- Coordination with the structural study
- Propping and preliminary securing
- Strengthening existing structures
Frequently asked questions about underpinning in Avusy
Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.
The underpinning must be defined with the structural and ground study. The temporary arrangements and the stages are designed before the work.
This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.
Whether you can stay in the home must be studied before the works. It depends on the work, the access and the safety measures planned. Specify your situation in the quote request so that the organisation and any periods of temporary rehousing can be prepared.
How we work in Avusy
Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.
Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.