Locality in the canton of Geneva · House, villa and apartment
Underpinning in Soral
MS Contractor SA studies your underpinning work in Soral with the existing structures and installations. If you want to prepare a change to the supports, the solution depends on the structural studies and the structures concerned. A localised job and a more extensive repair do not cover the same scope.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
A project in Soral?
State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. You receive a written quote, with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare a change to the supports, your quote request should specify the parts affected and the result you expect so that the possible solutions can be examined. Present the available plans and studies to prepare the phasing with the structural specialists. This information helps specify the items in your quote.
Documenting the signs observed before underpinning
A precise description helps prepare the review, without drawing conclusions remotely about their cause.
- Locate the cracks, movement or subsidence and say when you noticed them.
- Provide dated photos and any technical reports already available.
- Describe previous work and the access conditions to the areas affected.
The visit is used to record the visible signs and organise the useful investigations.
The choice of underpinning method depends on an appropriate study of the building and the ground.
Present my projectPreparing the study of the supports and structure
When movement is observed, the study may examine the soil, the supports and the variations in moisture. Vegetation and nearby utility networks must be taken into account depending on the situation. The investigations make it possible to look for the cause before choosing a repair.
An extension or a change to the ground must be studied with the existing foundations. It is useful to gather the plans and the known alterations. Examining the supports and the soil will make it possible to define the checks and any repairs.
The assessment always comes first
Each crack is measured, photographed and marked on a plan of the house. We install tell-tales to follow how they develop over a few months. A civil engineer then studies the soil, often with trial pits, and designs the solution. Without this preliminary work, there is a risk of treating a symptom and leaving the cause.
Sometimes the cause is simply a leaking pipe under the house that soaks the ground. Repairing it is part of the work.
Working under an occupied building
A foundation repair must be studied with the loads, the soil and the existing supports. Any underpinning sections and temporary supports are sized and organised before the excavation. The method is defined according to the constraints of the building.
For heavy loads or very poor soil, we go deeper with micropiles. This is also the technique used to lower a cellar or create a basement under a house that does not have one.
After the work
Once the foundations have been underpinned, the building is left to settle for a few weeks before the interior cracks are closed and the renders redone. If your house in Soral shows cracks that worry you, send us photos with a ruler next to them for scale.
What the works can include in Soral
The visit makes it possible to define the elements concerned and the work the project needs. The quote specifies the chosen work and the elements being kept.
- Coordination with the structural study
- Propping and preliminary securing
- Strengthening existing structures
- Localised foundation underpinning
For business premises in Soral, we plan the work to limit closure.
Frequently asked questions about underpinning in Soral
The underpinning must be defined with the structural and ground study. The temporary arrangements and the stages are designed before the work.
This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.
The plans if you have them, a few photos and a list of what you would like to change. Also tell us how to access the building.
Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.
How we work in Soral
Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.
Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.
Planning a project in Soral? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
