Locality in the canton of Geneva · House, villa and apartment
Underpinning in Laconnex
The scope of your underpinning work in Laconnex is defined with your needs and the existing structures. If you want to prepare a change to the supports, the solution depends on the structural studies and the structures concerned. If the premises remain occupied, the passages and uses to be maintained must be specified.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Do you live in Laconnex?
State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. Your quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare a change to the supports, your quote request should specify the uses that must remain possible during the work. Present the available plans and studies to prepare the phasing with the structural specialists. This information helps specify the items in your quote.
Documenting the signs observed before underpinning
A precise description helps prepare the review, without drawing conclusions remotely about their cause.
- Locate the cracks, movement or subsidence and say when you noticed them.
- Provide dated photos and any technical reports already available.
- Describe previous work and the access conditions to the areas affected.
The visit is used to record the visible signs and organise the useful investigations.
The choice of underpinning method depends on an appropriate study of the building and the ground.
Present my projectPreparing the study of the supports and structure
The old farmhouses of the Geneva Champagne region often rest on shallow foundations, sometimes a few courses of stone laid on the ground. A tree that is too close, a leaking pipe or a neighbouring excavation can be enough to destabilise them. We observe the cracks, measure them and install tell-tales to see whether they are developing.
A civil engineer then carries out the assessment and sets out the strengthening principle. We carry out the work according to the engineer’s plans. Without this assessment, there is a risk of treating the symptom and leaving the cause to continue.
Digging every other section under the wall
Leaving an entire wall without support, even for an hour, would be a serious mistake. We dig under the foundation in short sections, often about one metre, skipping every other section. Each section is concreted and packed tight against the old masonry before the next one is opened.
Depending on the soil, drilled micropiles can also be used. They reach a deeper bearing layer when the surface ground is too weak.
Gaining headroom in the cellar
Some owners want to turn a low cellar into a usable room. Lowering the floor means deepening the foundations at the same time. We also deal with the waterproofing and the drainage, otherwise the new room will remain damp.
It is a demanding project, but it creates floor space without changing the outside volume of the house. The final ceiling height, access via the staircase and ventilation of the room must also be considered.
Monitoring right to the end
Every morning during the work, we read the tell-tales on the cracks and check the levels again. The neighbouring house is also monitored when it is attached. A condition report before the work protects everyone.
If a crack in your house in Laconnex worries you, photograph it with a tape measure next to it and send it to us.
The work possible in Laconnex
Every home is different. The quote only includes the useful items once the actual condition has been seen.
- Propping and preliminary securing
- Strengthening existing structures
- Localised foundation underpinning
- Coordination with the structural study
Shops and practices in Laconnex can also entrust us with this type of work. We adapt to their activity.
Frequently asked questions about underpinning in Laconnex
Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.
The underpinning must be defined with the structural and ground study. The temporary arrangements and the stages are designed before the work.
This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.
We look at the rooms concerned, take measurements and listen to what you want. The quote then follows in writing.
How we work in Laconnex
Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.
Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.
Planning a project in Laconnex? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
