Before your work, gather the plans and describe the changes you have in mind. If you want to change an opening in the building, the position and appearance of the opening are part of the information to prepare with the building. The structures and equipment you want to keep must be identified to delimit the repairs.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
A project in Laconnex?
Tell us what you want to redo. We come to see the home before pricing anything. The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To change an opening in the building, your quote request should specify the finishes to keep and those you want to match. Present the planned changes with the plans and any discussions already under way before the work is scheduled. The quote can then distinguish the work to go ahead with from the options to discuss.
Gathering the documents for your transformation
The procedure to consider depends on the building and the exact nature of the project.
- Describe the changes you want, distinguishing the interior, the openings and the surroundings.
- Send the existing plans and the building documents you have.
- Mention any discussions already under way with the property management agency, the co-owners or the authorities.
We review the project and the missing information to identify the checks to carry out.
The procedures and decisions required remain to be confirmed with the competent bodies.
Present my projectDescribing the changes before the permit procedures
The first question concerns the land-use zoning of the plot. A plot in a building zone does not follow the same rules as a house located in an agricultural zone. Outside the building zone, federal law strictly limits alterations and extensions. We consult the canton’s geoportal to find out the exact situation of the plot.
The village centre may also be subject to heritage protection measures. A roof, a render or shutters may then be regulated. We check this before drawing anything. It is wiser to know these constraints at the start than to revise all the plans after a comment from the authorities.
Two possible routes at the cantonal office
In Geneva, applications go through the building permits office (Office des autorisations de construire). Small works often fall under a fast-track procedure. An extension, a new volume or a change of use generally require a full permit application, which takes longer.
Some interior work requires no procedure. Other work, such as converting a farm building into a home, affects the use of the building and always requires a complete application. The same applies to a swimming pool, a large canopy or a retaining wall visible from the road.
The application we prepare with you
Site plans, floor plans, sections, elevations, description of the materials. Depending on the project, we add an energy statement or photos of the existing building. A clear and complete application avoids requests for additional information that take weeks.
Neighbours are informed through the official publication and can submit comments. Discussing the project with them before submission often eases a lot of tension.
Not starting too early
Starting work without a permit risks a stop order and sometimes an order to restore the site. We wait for the decision and the appeal period before putting up the scaffolding.
Describe your project and your address, and we will look at what procedures it involves.
The work possible in Laconnex
Every home is different. The quote only includes the useful items once the actual condition has been seen.
- Preparing the useful technical information
- Coordination before the works start
- Identifying the approvals to obtain
- Checking the scope subject to a permit
Frequently asked questions about building permits in Laconnex
We gather the plans and technical documents with the architect or engineer when one is needed.
The time needed to prepare the quote is confirmed after the visit, depending on the measurements, the choice of supplies and the trades involved.
The stages and timeframes depend on the application. The work schedule is prepared with the formalities and conditions required before starting.
Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.
How we work in Laconnex
Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.
The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.
Planning a project in Laconnex? MS Contractor SA, a general building contractor in Geneva, works in houses, villas and apartments, with a no-obligation quote.