Locality in the canton of Geneva · House, villa and apartment
Building permit, APA and application file in Bardonnex
Before your work, gather the plans and describe the changes you have in mind. If you want to gather the documents for a project, the plans and precisely described changes help identify the missing documents. Other work planned in the same area may change the preparation and the sequence of trades.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
A project in Bardonnex?
Send us a description and two or three photos. The quote is made after seeing the site. We give you a no-obligation quote.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To gather the documents for a project, your quote request should specify the work planned with the other trades and how it connects. Present the planned changes with the plans and any discussions already under way before the work is scheduled. This information helps specify the items in your quote.
Gathering the documents for your transformation
The procedure to consider depends on the building and the exact nature of the project.
- Describe the changes you want, distinguishing the interior, the openings and the surroundings.
- Send the existing plans and the building documents you have.
- Mention any discussions already under way with the property management agency, the co-owners or the authorities.
We review the project and the missing information to identify the checks to carry out.
The procedures and decisions required remain to be confirmed with the competent bodies.
Present my projectDescribing the changes before the permit procedures
An extension, a conservatory, a swimming pool, a garden shelter of a certain size, a new window in the façade or the roof, an outdoor heat pump. All these projects in principle go through the building permits office. Depending on the scale, an application is submitted under the fast-track procedure or as a full application.
Interior work must be examined according to the structures affected and the conditions of the building. The formalities and the approvals required are checked before the work. Describe the changes you have in mind to specify what must be included in the application.
Agricultural zone and hamlets
A large part of the territory of Bardonnex is farmed. In the agricultural zone, converting an old barn into a home or extending a house is tightly regulated, and sometimes refused. The exact designation of the plot and the history of the building must be known.
In the old cores of the hamlets, the cantonal departments look closely at the materials, the colours, the shape of the dormers and the size of the openings. A project that respects the character of the place gets through better and faster.
Putting together a solid application
The application includes dimensioned plans, sections, elevations, a land register extract and often energy statements. For a heat pump, a noise study is required. For an extension, the distances to the boundaries and the height and volume limits must be demonstrated.
We work with architects and engineers who submit these applications regularly. We prepare the technical project in parallel, which avoids redrawing after the permit because a beam or a duct had not been planned.
The timescales to anticipate
Between submission and the answer, allow several weeks for a simple procedure and considerably longer for a full application. The neighbours and the municipality can give their views. So we set the start of the work on a realistic date rather than on a wish.
Explain what you want to build or change. We will look at your plot and tell you which procedure to plan for.
What the works can include in Bardonnex
The visit makes it possible to define the elements concerned and the work the project needs. The quote specifies the chosen work and the elements being kept.
- Checking the scope subject to a permit
- Preparing the useful technical information
- Coordination before the works start
- Identifying the approvals to obtain
Frequently asked questions about building permits in Bardonnex
It depends on what is affected. Façade, structure, services or common parts often require a procedure. We check before starting.
The stages and timeframes depend on the application. The work schedule is prepared with the formalities and conditions required before starting.
Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.
We gather the plans and technical documents with the architect or engineer when one is needed.
How we work in Bardonnex
Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.
The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.
Planning a project in Bardonnex? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
