The scope of your earthworks project in Bardonnex is defined with your needs and the existing structures. If you want to prepare an excavation, the layout and the dimensions must be examined with the utility networks and the neighbouring structures. The structures and equipment you want to keep must be identified to delimit the repairs.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Let’s talk about your home in Bardonnex
A word about the home and what you want to change is enough to get started. The rest is seen on site. We give you a no-obligation quote.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare an excavation, your quote request should specify the finishes to keep and those you want to match. Attach the plan and the known information on the utility networks to prepare the excavations and the access. This information helps specify the items in your quote.
Describing the ground before earthworks
Access and the future use of the land help prepare a first estimate.
- Explain what you want to create and give the approximate dimensions of the area.
- Photograph the slope, the route from the street and the neighbouring buildings.
- Point out known utility networks and any available drainage plans.
On site, the review covers in particular the levels, access and options for removing materials.
The nature of the subsoil and buried networks may require further checks.
Present my projectExamining the ground and access before the work
The countryside in the south of the canton largely rests on clay and silty soils, sometimes with pockets of gravel. Clay swells when it is wet and shrinks in summer. It holds poorly in slopes after heavy rain. For a deep excavation, a geotechnical study gives the bearing capacity and whether there is water.
We avoid digging just before a period of heavy rain. An open excavation that fills with water slows down the whole project and damages the subgrade.
Preparing access for the machines
A medium-sized excavator needs sufficient room to get through and ground that will bear it. In a garden with a lawn, we lay ground protection mats so as not to churn everything up. In a farm courtyard, we check the inspection chambers, vaulted cellars and buried pipes before taking a heavy machine across.
The lorries removing the soil must be able to load without blocking the lane. On a narrow country road, we organise the trips to cause as little disturbance as possible to the residents and the farm machinery.
What to do with the soil
The topsoil is set aside to be put back at the end. The deeper materials are either reused as backfill on the plot or taken to an approved landfill. Reusing on site reduces transport, but there must be room to store the heaps.
For a swimming pool or a basement, the volume excavated quickly becomes large. We calculate it before starting.
Thinking about water from the start
Earthworks change the path of rainwater. A slope that is too steep, backfill against an unprotected wall or a fall towards the house lead to water getting in. We plan the drainage, the falls and the outlet while the excavation is open, not afterwards.
Show us your land and your project. We will look at the access, the soil and the most suitable way to proceed in Bardonnex.
What we do in Bardonnex
The visit makes it possible to define the elements concerned and the work the project needs. The quote specifies the chosen work and the elements being kept.
- Backfilling and preparing the surroundings
- Excavations and levelling
- Preparing foundations and exterior structures
- Routes for underground services
Frequently asked questions about earthworks in Bardonnex
The time needed to prepare the quote is confirmed after the visit, depending on the measurements, the choice of supplies and the trades involved.
Yes. Temporary retaining work is sometimes needed. We see this during the visit.
Yes. We locate the buried pipes and cables before starting the excavator.
Some of it can stay on the plot. The rest goes to landfill according to its quality.
How we work in Bardonnex
We ask for the plans of the underground services before setting out the excavation. The topsoil is set aside, then we dig in layers down to firm ground.
The slopes are cut to a stable angle and the bottom of the excavation is levelled. The soil is removed or kept for backfilling.