MS Contractor SA

Locality in the canton of Geneva · House, villa and apartment

Building permit, APA and application file in Soral

Before your work, gather the plans and describe the changes you have in mind. If you want to change an opening in the building, the position and appearance of the opening are part of the information to prepare with the building. A localised job and a more extensive repair do not cover the same scope.

Our projects
Commercial premises under renovation with an exposed technical ceiling and white walls

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Let’s talk about your home in Soral

Tell us what you want to redo. We come to see the home before pricing anything. You receive a written, no-obligation quote.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To change an opening in the building, your quote request should specify the parts affected and the result you expect so that the possible solutions can be examined. Present the planned changes with the plans and any discussions already under way before the work is scheduled. The quote can then distinguish the work to go ahead with from the options to discuss.

Gathering the documents for your transformation

The procedure to consider depends on the building and the exact nature of the project.

  • Describe the changes you want, distinguishing the interior, the openings and the surroundings.
  • Send the existing plans and the building documents you have.
  • Mention any discussions already under way with the property management agency, the co-owners or the authorities.

We review the project and the missing information to identify the checks to carry out.

The procedures and decisions required remain to be confirmed with the competent bodies.

Present my project

Describing the changes before the permit procedures

In Geneva, applications go through the cantonal building permits office. A small change may follow the fast-track procedure, while a larger project requires a full permit. The zoning plan shows what type of land your house is on.

Outside the building zone, the rules are strict. Extending an old farmhouse located in an agricultural zone or converting a farm building into a home is only possible in specific cases. For houses in the heart of the village, the external appearance is also monitored. Façade colour, tiles, shape of the dormers, material of the shutters.

The documents to gather

A complete application includes plans of the existing building and the project, sections, elevations, a site plan and often photos. Depending on the work, an energy statement or details of the drainage are added. An incomplete application comes back with requests for additional information, and each round trip takes weeks.

The application is then published in the canton’s Official Gazette (Feuille d’avis officielle). Neighbours can consult it and submit comments. We take the time to talk with them beforehand, which is often simpler for everyone.

Work that does not always require one

The need for a permit or an agreement is checked with the building and the planned work, including for interior work. Present the elements being kept and those being changed. Changes to windows, the façade or the use must also appear in this preparation.

Our role between the office and you

We prepare the plans, gather the documents and follow the application through to the decision. For delicate cases in an agricultural zone, we work with an architect used to these applications. The work starts once the permit has become final, never before.

Send us the address of the plot in Soral and an idea of the project. We will quickly tell you which procedure applies.

What we do in Soral

The visit makes it possible to define the elements concerned and the work the project needs. The quote specifies the chosen work and the elements being kept.

  • Checking the scope subject to a permit
  • Preparing the useful technical information
  • Coordination before the works start
  • Identifying the approvals to obtain

Frequently asked questions about building permits in Soral

It depends on what is affected. Façade, structure, services or common parts often require a procedure. We check before starting.

The stages and timeframes depend on the application. The work schedule is prepared with the formalities and conditions required before starting.

Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.

We gather the plans and technical documents with the architect or engineer when one is needed.

How we work in Soral

Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.

The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.

Planning a project in Soral? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Start your project

You can also send us photos before the visit. This helps us come with the right questions. We give you a no-obligation quote.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française