Locality in the canton of Geneva · House, villa and apartment
Building permit, APA and application file in Avusy
Before your work, gather the plans and describe the changes you have in mind. If you want to gather the documents for a project, the plans and precisely described changes help identify the missing documents. If the premises remain occupied, the passages and uses to be maintained must be specified.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Building work in Avusy?
State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To gather the documents for a project, your quote request should specify the uses that must remain possible during the work. Present the planned changes with the plans and any discussions already under way before the work is scheduled. This information helps specify the items in your quote.
Gathering the documents for your transformation
The procedure to consider depends on the building and the exact nature of the project.
- Describe the changes you want, distinguishing the interior, the openings and the surroundings.
- Send the existing plans and the building documents you have.
- Mention any discussions already under way with the property management agency, the co-owners or the authorities.
We review the project and the missing information to identify the checks to carry out.
The procedures and decisions required remain to be confirmed with the competent bodies.
Present my projectDescribing the changes before the permit procedures
Everything starts with the zoning plan. A house in the heart of Athenaz or Sézegnin is not subject to the same requirements as a villa in a residential zone. In the agricultural zone, the possibilities for extension are very limited and each project is examined closely.
We consult the land register and the cantonal plans before drawing. This avoids putting together a project that has no chance of succeeding.
Fast-track APA or full application depending on the scale
The applicable procedure depends on the characteristics and the scope of the work. The project must be described before the procedures, the documents needed and their place in the schedule are determined.
Dimensioned plans, sections, elevations, photos of the existing building, thermal calculations depending on the case. We gather these documents with an architect or a draughtsman when the project requires it.
For simply installing solar panels on a villa roof, a notification is often enough. In a protected village, the same installation may require more. We check the specific case before answering you.
The neighbours and the municipality have their say
The application is published and the neighbours can consult it. The municipality also gives its opinion. In a village in Avusy where the houses touch, raising a storey or a new opening in a party wall may give rise to comments. It is wiser to discuss it before submission.
The cantonal departments may ask for additional information. A façade colour, a different tile, a hedge to be kept. We respond point by point without losing time.
Not starting anything too early
Starting without approval exposes you to a stop order and sometimes to an order to restore the site. So we plan the material orders and the teams according to the actual date of the permit. If you have a plan for an extension or an alteration, send us a site plan and a few photos for an initial opinion.
The work possible in Avusy
This list gives an idea of the work. The exact content depends on what we find on site.
- Identifying the approvals to obtain
- Checking the scope subject to a permit
- Preparing the useful technical information
- Coordination before the works start
For business premises in Avusy, we plan the work to limit closure.
Frequently asked questions about building permits in Avusy
We gather the plans and technical documents with the architect or engineer when one is needed.
Yes. A small job is prepared like a big one. We come and see before giving you an answer.
The stages and timeframes depend on the application. The work schedule is prepared with the formalities and conditions required before starting.
Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.
How we work in Avusy
Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.
The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.
Planning a project in Avusy? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
