Locality in the canton of Geneva · House, villa and apartment
Apartment, house and villa renovation company in Anières
MS Contractor SA studies your renovation project and its trades in Anières with the existing structures and installations. If you want to organise a renovation involving several trades, each job must be delimited to prepare the junctions and the sequence of trades. The limits of the finishing work are discussed in relation to the neighbouring surfaces, not just the work area.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
A project in Anières?
A word about the home and what you want to change is enough to get started. The rest is seen on site. We give you a no-obligation quote.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To organise a renovation involving several trades, your quote request should specify the junctions and where you want the finishing repairs to stop. Indicate the priority rooms, the elements being kept and the occupancy constraints to organise the work. This information helps specify the items in your quote.
Preparing your renovation project
A first conversation is more useful when the changes you want are already set out.
- State the type of property, the rooms concerned and what you would like to keep.
- Attach any available plan and photos of each space to be transformed.
- Say whether the premises will be occupied during the work and how they can be accessed.
The visit is used to examine the existing situation, the connections and the order of the work before the quote is finalised.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Open kitchen fitted with a light central island, built-in hob and wooden floor in the living area.

Kitchen layout with a central island, light fronts, matching worktop and wooden floor nearby.

Overall view of a living area combining an open kitchen with an island and a wooden plank floor.

Dark blue interior paint on the wall and the lower part of the sloping ceiling, around exposed wooden beams.
Examining the building before defining the renovation
If your house has stone walls or wooden floors, specify the openings and the changes you have in mind. The structures to keep and the supports concerned are identified during the visit. A further examination may be needed before planning a removal or a reinforcement.
In a villa, the age of the building is not enough to judge its condition. We examine the visible cracks, the rooms concerned and the installations with the documents available. The quote distinguishes the equipment to replace, the finishes to redo and the further checks needed before deciding to work on the structure.
The right order on site
We start with what is hidden in the walls. Dismantling, then running the electrical conduits and the water pipes. The plasterer then closes up, the tiler and the parquet layer follow, and the painter finishes. Swapping two stages means rework.
Our team coordinates this work with a single site manager. Once the permit is granted, you have one contact who knows the schedule, the orders and the lead times of each tradesperson.
Living in the house or moving out
Staying in the house during a renovation requires examining the rooms available and the planned cut-offs. Phasing and temporary facilities can be studied depending on the premises. This organisation and the need for temporary accommodation are specified before the schedule.
Before applying the finishes, we check that the substrates meet the required conditions. The timescales depend on the products used, the ventilation and the measurements taken on site. Point out any signs of damp or recent work so that they can be included in the visit.
The visit before any pricing
On site, we look at the condition of the roof, the windows, the electrical board and the drains. We note what can stay and what has to go. This list becomes the basis for the quote and the schedule. Tell us about your house and what you would like, and we will come and see it.
The most common items
Not everything is necessarily needed at your home. We only keep what is useful after seeing the premises.
- Coordination of technical installations
- Floors, walls, ceilings and finishes
- Step-by-step schedule up to handover
- Room layout and levelling
For business premises in Anières, we plan the work to limit closure.
Frequently asked questions about house renovation in Anières
We do. Mason, partner electrician, plasterer and painter follow a single schedule. Once the permit is granted, you have just one contact.
The duration depends on the rooms concerned, the installations to redo and the finishes chosen. Specify whether you need to stay in the home. The schedule is prepared after the project has been examined, with the service interruptions and drying times to plan for.
The plans if you have them, a few photos and a list of what you would like to change. Also tell us how to access the building.
Yes. We often start with what is hidden, electrics and plumbing by our partner companies, then move forward room by room.
How we work in Anières
Everything starts with a visit, to understand your project and survey the existing building. The work is then organised in order, demolition, services, partitions, then floors, painting and finishes.
Once the permit is granted, one point of contact coordinates the trades and keeps you informed of progress, until the keys are handed over.
Planning a project in Anières? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.