Before your work, gather the plans and describe the changes you have in mind. If you want to modify an opening in the building, the location and the appearance of the opening are among the information to prepare with the building. Any points still unknown must be identified before a final scope is chosen.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Is your home in Anières?
Tell us about the project as you see it. We come to measure and look at the actual condition before answering you. You receive a written quote, with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To modify an opening in the building, your quote request should specify the confirmed information and the questions to check during the visit. Present the planned changes with the plans and any discussions already under way before the work is scheduled. The quote can then distinguish the work to go ahead with from the options to discuss.
Gathering the documents for your transformation
The procedure to consider depends on the building and the exact nature of the project.
- Describe the changes you want, distinguishing the interior, the openings and the surroundings.
- Send the existing plans and the building documents you have.
- Mention any discussions already under way with the property management agency, the co-owners or the authorities.
We review the project and the missing information to identify the checks to carry out.
The procedures and decisions required remain to be confirmed with the competent bodies.
Present my projectDescribing the changes before the permit procedures
Redoing a kitchen or a bathroom inside generally requires no permit. As soon as the exterior appearance changes, the situation is different. A new roof window, a change of façade colour, a conservatory, a fixed pergola, a boundary wall. We check case by case before starting anything.
There are two procedures. The fast-track procedure suits small works. The full application applies to larger projects, such as an extension or a raised storey.
The particularities of a lakeside municipality
Anières lies on the left bank, between vineyards, fields and the shore. Depending on where the plot is, other rules apply. Near the lake, shoreline protection can limit what is built. In the old village, the appearance of roofs and façades is closely monitored. In the agricultural zone, the possibilities are tightly regulated.
That is why we first consult the land register and the zoning plan. We then know which constraints apply to your land before designing the project.
What the application contains
Site plans, floor plans, sections and elevations showing the existing state and the project. We add photos, a description of the materials and sometimes an energy statement. A complete application avoids requests for additional documents that take weeks.
The neighbours can consult the application during the public notice period. Talking to them about the project before submitting it often defuses objections.
Allow several weeks for a fast-track procedure and several months for a full application. We build this time into the schedule so that the tradespeople are booked at the right time.
Our role during the procedure
We put the application together with an architect or a draughtsman, submit it and respond to the comments of the authorities. Once the permit is granted, our team can move straight on to the work. Describe what you want to build and we will look at what is feasible on your plot.
What the works can include in Anières
The visit makes it possible to define the elements concerned and the work the project needs. The quote specifies the chosen work and the elements being kept.
- Coordination before the works start
- Identifying the approvals to obtain
- Checking the scope subject to a permit
- Preparing the useful technical information
Frequently asked questions about building permits in Anières
The time needed to prepare the quote is confirmed after the visit, depending on the measurements, the choice of supplies and the trades involved.
The stages and timeframes depend on the application. The work schedule is prepared with the formalities and conditions required before starting.
Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.
We gather the plans and technical documents with the architect or engineer when one is needed.
How we work in Anières
Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.
The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.