For your earthworks project in Arare-Dessus, start from the elements to change and those you want to keep. If you want to prepare a plot before construction, the footprint must be examined with the project and the information available on the ground. Any points still unknown should be identified before a final scope is chosen.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
A project in Arare-Dessus?
State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. We give you a no-obligation quote.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare a plot before construction, your quote request should specify the confirmed information and the questions to be checked during the visit. Attach the plan and the known information on the underground networks to prepare the excavations and access. This information helps specify the items in your quote.
Describing the ground before earthworks
Access and the future use of the land help prepare a first estimate.
- Explain what you want to create and give the approximate dimensions of the area.
- Photograph the slope, the route from the street and the neighbouring buildings.
- Point out known utility networks and any available drainage plans.
On site, the review covers in particular the levels, access and options for removing materials.
The nature of the subsoil and buried networks may require further checks.
Present my projectExamining the ground and access before the work
A large part of the canton sits on moraine ground and clay layers. These soils hold well when dry but become sticky and unstable after rain. For an extension or a heavier building, a geotechnical study indicates the type of soil and the depth of the foundations.
Buried pipes are also checked. Water, electricity, telephone and drains often run through the garden without being marked on a plan. Locating them before the work avoids cutting a line in the middle of the job.
Getting a digger into an existing garden
In a hamlet, access is sometimes the most delicate point. Narrow gate, paved yard, trees to be preserved. A suitable machine is chosen, sometimes a mini digger, and ground protection mats are laid so as not to mark the lawn. The soil is stored on site or removed as the work progresses, depending on the space available.
Clean soil can be reused to reshape the garden. The rest goes to an approved landfill.
Water, the key factor in earthworks
An excavation opened in autumn fills quickly. Pumping is planned if necessary and the bottom is not left exposed for too long. Around a house, earthworks are often used to install drainage along buried walls, with a protective membrane and filtering gravel.
Rainwater and drainage water must then go somewhere. Connection, soakaway or retention tank, this is decided according to the plot.
Preparing the next stage of the works
Good earthworks leave a clean base, at the right level, ready for the blinding concrete. The levels are checked with the mason before anything is closed. On a gently sloping plot in Arare-Dessus, backfill is compacted in layers to avoid settlement. Tell us what you want to build and we will come and see the land and its access.
What the work in Arare-Dessus can include
Here is what the works can cover. We sort it out together during the visit.
- Excavations and levelling
- Preparing foundations and exterior structures
This service also covers shops, pharmacies and offices in Arare-Dessus.
Frequently asked questions about earthworks in Arare-Dessus
It depends on what is affected. Façade, structure, services or common parts often require a procedure. We check before starting.
Yes. Temporary retaining work is sometimes needed. We see this during the visit.
Yes. We locate the buried pipes and cables before starting the excavator.
Some of it can stay on the plot. The rest goes to landfill according to its quality.
How we work in Arare-Dessus
We ask for the plans of the underground services before setting out the excavation. The topsoil is set aside, then we dig in layers down to firm ground.
The slopes are cut to a stable angle and the bottom of the excavation is levelled. The soil is removed or kept for backfilling.